1. What are some key steps in the SAP Best Practices scenario Nonconformance Management (2QN)? There are 2 correct answers to this question.
Response:
Execute root cause analysis
Define preventive actions
Complete defect processing
Process defect
What are some key steps in the SAP Best Practices scenario Nonconformance Management (2QN)? There are 2 correct answers to this question.
2. In SAP S/4HANA several production versions can be defined in the _____________. Please choose the correct answer.
Complex
Business Issue
Business Analysts
 Material master
3. With the new Record Inspection Results app, a Quality Technician can now: There are 3 correct answers to this question.
View the number of defects on the worklist page
You can start a standalone master server by executing.
Display defect number, defect code group, defect category, defect description, and date of creation of defect on the defect details popover
Navigate to the Process Defects app from the defect details popover

4. What are the material requirements which can be executed in SAP S/4HANA Digital Core ERP-PP or embedded PP/DS? Please choose the correct answer.
planning (MRP) and capacity planning (CRP).
CVSS version 3 also includes the requirements of privileges in its base metrics.
Protecting accounts with passwords.
Disabling unnecessary accounts.
Protecting management interfaces and applications.
5. What is a monitoring Tool that provides the planner pointed information and access to problem situations in production planning in ePP/DS? Please choose the correct answer.
Espionage
IP Infringement
Alert Monitor
Natural Disasters
6. How to ensure consistency of the availability dates and requirements dates between PP/DS and ERP on SAP S/4HANA? Please choose the correct answer.
A bot on the computer is brute forcing passwords against a website
All components and items of a planned order should be integrated with ePP/DS for which the requirements dates and availability dates that have been planned using detailed scheduling are required based on the dates of the assigned operations.
Can indicate a serious impending situation.
The end user purchased and installed a PUP from a web browser
How to ensure consistency of the availability dates and requirements dates between PP/DS and ERP on SAP S/4HANA? Please choose the correct answer.
7. Based on the generated orders in Detailed Scheduling (DS) the orders and operations are ___________. Please choose the correct answer.
Fixed
CVSS
All of the above
Dynamic
Based on the generated orders in Detailed Scheduling (DS) the orders and operations are ___________. Please choose the correct answer.
8. What was enhanced to provide additional selection criteria for the automatic processing of change requests for which no response has been received from suppliers? Please choose the correct answer.
Spark's unified platform
To launch a Spark standalone cluster
sharing information from memory
The app Schedule Processing of MRP Change Requests
What was enhanced to provide additional selection criteria for the automatic processing of change requests for which no response has been received from suppliers? Please choose the correct answer.
9. The overall planning process starts with which of the following requirements? Please choose the correct answer.
Databricks
Generic Algorithm
Regression
Independent
The overall planning process starts with which of the following requirements? Please choose the correct answer.
10. In SAP S/4HANA, what is the is a new MRP run optimized for SAP HANA? Please choose the correct answer.
Planned orders
MRP Live (MD01N)
Solid Arrows
Spark Streaming
In SAP S/4HANA, what is the is a new MRP run optimized for SAP HANA? Please choose the correct answer.
11. What does the calculation of the Accuracy in the Maintain PIRs app considers? Please choose the correct answer.
the withdrawal quantity making the forecast accuracy of the planned independent requirements (PIRs) even more precise.
where the argument to the for each method is an expression for an anonymous function.
applying this to your strategies will enable them to detect changes in customer behavior as they occur and act on them immediately.
allows you to write quick throw away functions without naming them
What does the calculation of the Accuracy in the Maintain PIRs app considers? Please choose the correct answer.
X the withdrawal quantity making the forecast accuracy of the planned independent requirements (PIRs) even more precise.
12. What is used to assign suitable existing product receipts and product stocks, which can cover the requirement, to a product requirement? Please choose the correct answer.
3rd Party Vendor breaches
Gray box test
Phishing
Pegging
What is used to assign suitable existing product receipts and product stocks, which can cover the requirement, to a product requirement? Please choose the correct answer.
13. Which of the following option is integrated into the SAP S/4HANA Material Master with CDS Redirects on material master? Please choose the correct answer.
Advanced Planning Product Master
Production Planning orders
the BADI implementation CUSLNTRTO_ADDIN
In Production Planning and Detailed Scheduling.
Which of the following option is integrated into the SAP S/4HANA Material Master with CDS Redirects on material master? Please choose the correct answer.
14. Which user ID must be locked for security reasons after you create an administrator business user? Please choose the correct answer.
SAP Customer Initial User (SAP_CUST_INI)
SAP Customer Business User (SAP_CUST_BUS)
SAP E-Mail Inbound Processing (SAP_SMTP_IN)
SAP Lifecycle Management Administrator (SAP_LMADM)
15. Which of the following activity is performed as a Quality Engineer? Please choose the correct answer.
choose single inspection units (serial numbers) of an inspection lot on the usage decision details page and selectively post them to different stocks, such as, unrestricted use, scrap, sample, blocked, new material, or reserves.
Instant access to reliable infrastructure and tools to explore data, prototype advanced analytics algorithms, and curate visual reports without building anything themselves or wait for someone else to do it for them.
access to historical data which exhibits known customer behavior and knowing what problem we are trying to solve
Because it can do many types of workloads, you don't mean various tools for managing each.
16. What does provide advanced planning options and is especially suitable for repetitive manufacturing? Please choose the correct answer.
The extremely flexible product planning table
Detailed Scheduling planning board
PP/DS Optimizer
Release invoice for payment.
What does provide advanced planning options and is especially suitable for repetitive manufacturing? Please choose the correct answer.
17. The operations in ERP Planned Orders are: Please choose the correct answer.
By changing resources (capacity, work times, and so on) or changing orders (quantities, data)
the operations of the Standard sequence scheduled to the Basic dates.
detailed scheduling planning board
to fix a pegging relationship.
18. Which of the following option makes a statement about the compactness of the orders within the optimization horizon? Please choose the correct answer.
Google AI platform
Accelerate ETL
Import external models used
production span
19. The Material requirements planning in PP/DS is usually evaluated from where? Please choose the correct answer.
Asset Identification
Threat Evaluation
product view
Data sensitive labeling
20. In which of the following applications optimization is integrated? There are 3 correct answers to this question.
Production Planning Run
Product Planning Table
Detailed Scheduling Planning Board
X Production Planning Run
X Product Planning Table
X Detailed Scheduling Planning Board
21. What does offer a great bandwidth of planning functionality with can be used in background jobs as well as interactive planning? Please choose the correct answer.
Heuristics
Advanced Planning
Hardware token
Keypad PIN
X Heuristics
22. For which extensibility approach do you use the SAP Cloud Platform? Please choose the correct answer.
Side-by-side extensibility
Classic extensibility
Managed extensibility
Key user extensibility
X Side-by-side extensibility
23. What are the orders created for in-house production. These orders are converted into manufacturing orders at a later process? Please choose the correct answer.
X Planned orders
24. According to the SAP Activate methodology, in what phase is the Fit-to-Standard workshop executed? Please choose the correct answer.
Realize
Explore
Prepare
Deploy
25. Is Production Version is also required for phantom items? Please choose the correct answer.
No
Yes
26. is an algorithm, which can be perform a planning function for selected objects? Please choose the correct answer.
Text Extracting
Text Categorization
Heuristic
27. How can you specify a heuristic for product planning in PP/DS for SAP S/4HANA, if the product is not to be planned using the standard heuristic defined in Customizing? Please choose the correct answer.
their requirement type or by the requirements strategy.
On the Advanced Planning tab page in the SAP S/4HANA Material master
28. What are the two different types of pegging relationships? There are 2 correct answers to this question.
29. What must be defined in SAP Central Business Configuration prior to creating the organizational structure? There are 2 correct answers to this question.
Fiscal year variant
Leading ledger
Chart of accounts
Group currency
X Fiscal year variant
X Group currency
30. What represent the business procedures for the planning of production and procurement quantities? Please choose the correct answer.
Planning strategies
Strategies for Make-to-Stock Production
Strategies for Planning Components
Strategies for Make-to-Order Production
31. Who does provide a range of predefined alert types? Please choose the correct answer.
32. What are the two options maintaining the available capacity for planning in Advanced Planning? There are 2 correct answers to this question.
You can maintain the available capacity in ePP/DS. Only the header data for the work center capacity is transferred from SAP S/4HANA Digital Core to PP/DS. Intervals of available capacity that exceed this overall capacity are maintained in ePP/DS
The available capacity with intervals and shift pattern is maintained entirely in SAP S/4HANA-ERP as ’external capacity’ for planning in Advance Planning or APO-PPDS. Maintaining Intervals of available capacity that are in PP/DS is not possible. To prevent data inconsistencies when you are also using the Fiori App Monitor Capacity Utilization the Capacity Variants, Shifts and Definitions are disabled in SAP GUI when External Capacity is selected for Resources
Social engineering conversation by a threat actor done in person or by phone, email, text, or instant messaging to obtain sensitive information from the user such as credentials, date of birth, account information, social security numbers, and so on.
It seeks to identify issues in a network, application, database, or other IT systems prior to it being inadvertently or purposely used to compromise a system.
X You can maintain the available capacity in ePP/DS. Only the header data for the work center capacity is transferred from SAP S/4HANA Digital Core to PP/DS. Intervals of available capacity that exceed this overall capacity are maintained in ePP/DS
X The available capacity with intervals and shift pattern is maintained entirely in SAP S/4HANA-ERP as ’external capacity’ for planning in Advance Planning or APO-PPDS. Maintaining Intervals of available capacity that are in PP/DS is not possible. To prevent data inconsistencies when you are also using the Fiori App Monitor Capacity Utilization the Capacity Variants, Shifts and Definitions are disabled in SAP GUI when External Capacity is selected for Resources
33. What are some of the benefits that the SAP Best Practices scenario Make-to-Order Production - Semi-finished Goods Planning and Assembly (1BM) can provide? There are 2 correct answers to this question.
Reduce total lead time
Minimize inventory of semifinished goods
Create purchase requisitions for raw materials early
Optimize lot size of finished goods production order
34. PP/DS for SAP S/4HANA supports various Manufacturing Models. What are they? There are 4 correct answers to this question.
Engineer to Order
Flow Manufacturing
Make to Order with Order BOM
Project Manufacturing
Disruption of software deployment
X Engineer to Order
X Flow Manufacturing
X Make to Order with Order BOM
X Project Manufacturing
35. SAP standard heuristics are available in which of the following areas? There are 2 correct answers to this question.
understand attackers and their methods; often done by constructing threat scenarios
The document is a keylogger that stores all keystrokes should the account be compromised
Production planning: This heuristic is mainly for lot-sizing procedures with planning focus on the products.
Detailed scheduling: These heuristics are for scheduling; their planning focus is on resources and operations. Examples of such heuristics are reduce lead-time and dissolve backlog
36. Planned order in ERP on SAP S/4HANA contain the all dependent requirements for: Please choose the correct answer.
Monitoring large data transfer transactions in the firewall logs
describes an approach, philosophy, or strategy regarding security
Implementing a group policy to block user access to system files
both Advanced Planning and non-Advanced Planning components.
37. In ePP/DS in PP, What are the orders generated according to the required stock-/requirement situation and lot-sizing procedure (infinite order scheduling)? Please choose the correct answer.
38. Which of the following option you can choose at the time of releasing a simulation in the Process pMRP Simulation app? Please choose the correct answer.
to have capacity proposals created and exported to the Mass Maintenance of Work Center Capacities app for capacity adjustments.
To connect to a specific cluster, open the cluster menu by clicking the Attached/Detached menu item and then selecting your desired cluster.
Decision Table, Scorecards, Decision trees and Predictive models, as well as expressions.
This script takes care of: setting up the class path with Spark and its dependencies
39. Which solution supports you in identifying root causes of problems, taking actions to prevent such problems in the future, and documenting the problem–solving process? Please choose the correct answer.
SAP Supplier Problem–Solving
only when you call an action
maximum response waiting time
path to file name to read from
40. The Optimization allows to optimize the ___________ and the ___________ of existing operations/activities that were previously generated by the production planning run or manual planning. Please choose the correct answer.
Poor system logging
Cross-site scripting
Server-side request forgery
production dates/sequences, resource assignment
41. Which business objects were initially released as part of the SAP One Domain Model? There are 2 correct answers to this question.
Material
Workforce person
Cost center
Bank
42. Which one of the following option reads material receipts and requirements, calculates shortages, and creates planned orders and purchase requisitions all in one database procedure? Please choose the correct answer.
Degaussing
Netcat
MRP Live
Steganography
Which one of the following option reads material receipts and requirements, calculates shortages, and creates planned orders and purchase requisitions all in one database procedure? Please choose the correct answer.
43. What is the PP planning procedure in the product master describes? Please choose the correct answer.
That how a product is to be planned.
Healthy security posture
Hardening and reporting
Proper configuration of controls
44. What is the most important tool in capacity planning? Please choose the correct answer.
X detailed scheduling planning board
45. Who are interested in PP/DS or responsible for the implementation of production planning with SAP S/4HANA? There are 2 correct answers to this question.
project team members
GeneralRegressionModel
key user
Multiple Spark Contexts
project team members
46. Which of the following business roles are relevant for SAP Best Practices scenario Production Subcontracting – External Processing (BJK)? There are 2 correct answers to this question.
Production Supervisor
Billing Clerk
Warehouse Clerk
Production Controller
Warehouse Clerk
47. Which of the following option can make sure BOM and routing fit together? Please choose the correct answer.
Production versions
SAP S/4HANA Digital Core.
Language detection
X Production versions
48. Item grouping in multilevel BOM allows BOM engineers to group BOM items together so as to structure the BOM in an organized fashion without creation of subassembly material.
This enables BOM engineers to: There are 3 correct answers to this question.
Group component variants in variant BOMs
Represent the modular structure of the product in a multilevel BOM
Group a BOM without creating additional materials
Databricks Enterprise Security Framework
X Group component variants in variant BOMs
X Represent the modular structure of the product in a multilevel BOM
X Group a BOM without creating additional materials
49. What is primarily used in the context of capacity planning and optimization, that is, in the step after material requirements planning? Please choose the correct answer.
service heuristics
attack tree
Attack surface
Code review
50. Based on pegging relationships, the system can: There are 3 correct answers to this question.
Optimize delays and storage costs in PP/DS optimization
Identify planning problems on various production levels and display them using alerts
Select the applicable data migration objects from the complete list of objects.
Automatically forward scheduling specifications for an order to the dependent orders in the pegging structure, in Detailed Scheduling
X Optimize delays and storage costs in PP/DS optimization
X Identify planning problems on various production levels and display them using alerts
X Automatically forward scheduling specifications for an order to the dependent orders in the pegging structure, in Detailed Scheduling
51. What will be replaced by Integrated Business Planning IBP (Functionality available in SAP S/4HANA delivery but not considered as future technology)? Please choose the correct answer.
Integrated Business Planning (IBP)
SAP S/4HANA Sales & Operations Planning (SOP)
Internal Service User
J2EE User
X SAP S/4HANA Sales & Operations Planning (SOP)
52. What is the objective of a production planning run? Please choose the correct answer.
to determine each item's relative value.
Install a NIDS device at the boundary
to create a feasible production program
Segment the network with firewalls
53. In SAP S/4HANA, which type of MRP run has to be scheduled for SAP S/4HANA-ERP and Advanced Planning Materials? Please choose the correct answer.
SMS text
Only single
Privacy
Tcpdump
54. What does determine a manufacturing process by specifying a routing and a bill of material? Please choose the correct answer.
Containerization
Vulnerability Management
Automated Failover
Production version
55. What will you determined using planned independent requirements from a demand forecast, sales orders or stock transfer requirements? Please choose the correct answer.
Configuration validation can check if security policies were applied
SAP EWA provides the most comprehensive security check
Configuration validation helps to standardize and harmonize security related configuration items for ABAP systems only
The demand program, which has to be covered by the production planning in the plant / MRP_Area
56. The priority of change request proposals can also be determined based on an: Please choose the correct answer.
Easy data exploration allows teams to determine what the data lets you do.
Interactive dashboards empower teams to create dynamic reports.
A strategy that contains an Adaptive Model component is executed.
implementation of the Business Add-In Retrieve Priority for MRP Change Request (PP_MRP_CR_RETRIEVE_PRIORITY)
57. What is a current overview of the stock, receipts, and requirements for a product in a specific location for a specific planning version? Please choose the correct answer.
58. What does fixed pegging enables? Please choose the correct answer.
59. Which of the following option will not be supported in PP/DS for SAP S/4HANA? Please choose the correct answer.
APO-PP/DS Standard PP planning procedures 3
60. What is a solution that enables a collaborative problem–solving process together with suppliers?
Please choose the correct answer.
61. How can be production dates are determined? Please choose the correct answer.
Enable MAC filtering on the switches that support the wireless network.
by exploding the production data structure (PDS) and then carrying out lead time scheduling.
Run a vulnerability scan on all the devices in the wireless network
understand attackers and their methods
62. You are designing the migration of data for a new SAP S/4HANA Cloud customer. What must the customer do to prepare? Please choose the correct answer.
Change the provided Excel templates to match the customer's requirements.
Design the programs or reports needed to extract the legacy data.
Design the interfaces with the non-SAP legacy system for mass transfer.
63. How can you change the planning situation? Please choose the correct answer.
64. Where do you activate SAP Best Practice processes in your quality system? Please choose the correct answer.
SAP S/4HANA Cloud Manage Your Solution app
SAP Central Business Configuration
SAP Best Practices Explorer
SAP Solution Builder
65. The planning in embedded PP/DS is always based on own master data (products, resources and PDSs) that must be integrated from: Please choose the correct answer.
66. How can you use the Alert Monitor to monitor production planning in PP/DS? Please choose the correct answer.
transformations return pointers to new RDDs.
we must define an alert profile for the application.
67. The consumption-based procedures of forecast- based and time-phased planning are supported in ePP/DS. Please choose the correct answer.
True
False
68. Which of the following capabilities can you use in the SAP Fiori app Manage Usage Decisions? There are 2 correct answers to this question.
Change the inspection lot ID.
Record inspection results.
Edit comments of an inspection lot.
View contextual information related to material.
69. What is the central tool for interactive capacity planning? Please choose the correct answer.
70. Most of the resource master data does not need any maintenance in the ePP/DS resource master. Please choose the correct answer.
71. What can be executed as interactive single-Item for a product or as total planning for a group of products that may be freely defined (e.g. all products from a plant)? Please choose the correct answer.
72. In the SAP Ariba Payment and Discount Management process, what step comes immediately after the Suggest a Discount for Early Processing step? Please choose the correct answer.
Update payment proposal.
Evaluate payment suggestion.
Start payment run.
73. In ePP/DS the Material Requirements Planning and Detailed Scheduling is performed by: Please choose the correct answer.
74. What does organize the material flow through all BOM levels, from the procurement of components and raw materials to delivery of a sales order? Please choose the correct answer.
75. In the standard version of Advanced Planning in SAPS/4HANA (e//PDS), where is a range of heuristics available for various tasks? Please choose the correct answer.
76. In SAP S/4HANA Demand Planning to generate forecasts as a future demand program is executed in ___________________. Please choose the correct answer.
Integrated Business Planning (IBP).
77. What is a planning function that executes planning for selected objects (in this way, the focus of planning can be products, orders, operations, resources, or line networks) using a particular algorithm? Please choose the correct answer.
MRP run
Metasploit
penetration test
78. What is use to define a custom developed solution for alternative resources / modes in the PDS or implement the SAP Consulting Solution? Please choose the correct answer.
79. In SAP S/4HANA, what is the is a new MRP run optimized for SAP HANA? Please choose the correct answer.
80. SAP standard heuristics are available in which of the following areas? There are 2 correct answers to this question.
X Detailed scheduling: These heuristics are for scheduling; their planning focus is on resources and operations. Examples of such heuristics are reduce lead-time and dissolve backlog
X Production planning: This heuristic is mainly for lot-sizing procedures with planning focus on the products.
81. Based on pegging relationships, the system can: There are 3 correct answers to this question.
X Optimize delays and storage costs in PP/DS optimization
82. Most of the resource master data does not need any maintenance in the ePP/DS resource master. Please choose the correct answer.
X True
83. What will be replaced by Integrated Business Planning IBP (Functionality available in SAP S/4HANA delivery but not considered as future technology)? Please choose the correct answer.
84. Which of the following option can make sure BOM and routing fit together? Please choose the correct answer.
85. What does determine expected material shortages and creates planned orders, purchase requisitions, or delivery schedule lines to cover the expected material shortages?
X MRP run
86. Which of the following option makes a statement about the compactness of the orders within the optimization horizon? Please choose the correct answer.
X production span
87. What are some key steps in the SAP Best Practices scenario Nonconformance Management (2QN)? There are 2 correct answers to this question.
X Complete defect processing
X Process defect
88. Based on the generated orders in Detailed Scheduling (DS) the orders and operations are ___________. Please choose the correct answer.
X Fixed
89. What does fixed pegging enables? Please choose the correct answer.
90. What does the calculation of the Accuracy in the Maintain PIRs app considers? Please choose the correct answer.
91. In which of the following applications optimization is integrated? There are 3 correct answers to this question.
92. How can you specify a heuristic for product planning in PP/DS for SAP S/4HANA, if the product is not to be planned using the standard heuristic defined in Customizing? Please choose the correct answer.
X On the Advanced Planning tab page in the SAP S/4HANA Material master
93. Which business objects were initially released as part of the SAP One Domain Model? There are 2 correct answers to this question.
X Workforce person
X Cost center
94. Which solution supports you in identifying root causes of problems, taking actions to prevent such problems in the future, and documenting the problem–solving process?
95. The Optimization allows to optimize the ___________ and the ___________ of existing operations/activities that were previously generated by the production planning run or manual planning. Please choose the correct answer.
X production dates/sequences, resource assignment
96. How can be MRP procedure distinguished? Please choose the correct answer.
it is distinguished between material requirement planning and consumption-based planning.
you gather information about the target through reconnaissance
you're going to enumerate the target to identify known vulnerabilities.
exploit the network to gain user or privilege access. E. document all of your results of the pentest and give that report to the organization.
X it is distinguished between material requirement planning and consumption-based planning.
97. The overall planning process starts with which of the following requirements?
X Independent
98. What is a monitoring Tool that provides the planner pointed information and access to problem situations in production planning in ePP/DS? Please choose the correct answer.
X Alert Monitor
99. Which of the following option you can choose at the time of releasing a simulation in the Process pMRP Simulation app? Please choose the correct answer.
X to have capacity proposals created and exported to the Mass Maintenance of Work Center Capacities app for capacity adjustments.
100. For which extensibility approach do you use the SAP Cloud Platform?
101. What does determine a manufacturing process by specifying a routing and a bill of material? Please choose the correct answer.
X Production version
102. The interactive planning in ePP/DS can be carried out from: Please choose the correct answer.
Provides strong encryption at-rest and in-flight with best-in-class standards such as SSL and keys stored in AWS Key Management System (KMS).
Integrated Identity Management: Facilitates seamless integration with enterprise identity providers via SAML 2.0 and Active Directory.
This is the holy grail of what an RDD is. RDDs are a 'immutable resilient distributed collection of records' which can be stored in the volatile memory
the product view, product planning table, and the detailed scheduling planning board or by the new MRP Apps like “Monitor Material Coverage” & “Manage Material Coverage” in the FIORI Launchpad.
X the product view, product planning table, and the detailed scheduling planning board or by the new MRP Apps like “Monitor Material Coverage” & “Manage Material Coverage” in the FIORI Launchpad.
103. In the standard version of Advanced Planning in SAPS/4HANA (e//PDS), where is a range of heuristics available for various tasks? Please choose the correct answer.
104. What does provide advanced planning options and is especially suitable for repetitive manufacturing? Please choose the correct answer.
X The extremely flexible product planning table
105. Who are able to specify subitems so that you can specify different installation points, quantity required, and subitem text? Please choose the correct answer.
BOM engineers
X BOM engineers
106. What is the PP planning procedure in the product master describes?
That how a product is to be planned
X That how a product is to be planned
107. How can you change the planning situation? Please choose the correct answer.
X By changing resources (capacity, work times, and so on) or changing orders (quantities, data)
108. In ePP/DS the Material Requirements Planning and Detailed Scheduling is performed by: Please choose the correct answer.
109. Which of the following option will not be supported in PP/DS for SAP S/4HANA? Please choose the correct answer.
X APO-PP/DS Standard PP planning procedures 3
110. What can be executed as interactive single-Item for a product or as total planning for a group of products that may be freely defined (e.g. all products from a plant)? Please choose the correct answer.
X Advanced Planning
111. What is primarily used in the context of capacity planning and optimization, that is, in the step after material requirements planning? Please choose the correct answer.
X service heuristics
112. With the new Record Inspection Results app, a Quality Technician can now: There are 3 correct answers to this question.
X View the number of defects on the worklist page
X Display defect number, defect code group, defect category, defect description, and date of creation of defect on the defect details popover
X Navigate to the Process Defects app from the defect details popover
113. The operations in ERP Planned Orders are: Please choose the correct answer.
X the operations of the Standard sequence scheduled to the Basic dates.
114. What represent the business procedures for the planning of production and procurement quantities? Please choose the correct answer.
115. In SAP S/4HANA Demand Planning to generate forecasts as a future demand program is executed in ___________________. Please choose the correct answer.
X Integrated Business Planning (IBP).
116. Which of the following capabilities can you use in the SAP Fiori app Manage Usage Decisions? There are 2 correct answers to this question.
X View contextual information related to material.
X Edit comments of an inspection lot.
117. How can you use the Alert Monitor to monitor production planning in PP/DS? Please choose the correct answer.
X we must define an alert profile for the application.
118. What are the following activities you can do as a Production Engineer in the Discrete Manufacturing Industry?
There are 3 correct answers to this question.
can navigate to all the relevant apps to display work centers,
create work centers, change work centers, replace existing values in work centers and check usage of work centers
navigate to mass maintenance of work center capacities for creating or updating of intervals and shifts and to edit the capacities.
applying this to your strategies will enable them to detect changes in customer behavior as they occur and act on them immediately
X can navigate to all the relevant apps to display work centers,
X create work centers, change work centers, replace existing values in work centers and check usage of work centers
X navigate to mass maintenance of work center capacities for creating or updating of intervals and shifts and to edit the capacities.
Last changed10 months ago