How can a material availability check be triggered automatically for a production order?
There are 2 correct answers to this question.
Response:
By mass processing
By order confirmation
By order release
By capacity planning
√ By mass processing
√ By order release
Why would you use phantom assemblies?
There are 3 correct answers to this question.
To increase the number of planning levels
To reduce the number of changes required in bills of materials
To simplify the structure of bills of materials
To reduce the number of material masters
To make the assignment of components easier
√ To reduce the number of changes required in bills of materials
√ To simplify the structure of bills of materials
√ To make the assignment of components easier
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have?
Model a transportation resource in the location master.
Model a handling resource in the location master and goods receipt time in the mater all master.
Model a resource inbound in the location master.
Model a separate resource in the production data structure.
√ Model a transportation resource in the location master.
√ Model a handling resource in the location master and goods receipt time in the mater all master.
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
Please choose the correct answer.
It is converted into a reservation.
It is converted into a schedule line.
It is converted into a planned order.
It is converted into a production order.
√ It is converted into a reservation.
The stock/requirements list for a material using which MTS strategy shows the special stock segment?
Planning without final assembly and without MTO: Strategy 52
Production by lot size: Strategy 30
Net requirements planning: Strategy 10
Gross requirements planning: Strategy 11
√ Gross requirements planning: Strategy 11
Which of the following statements describe the Monitor Work Center Schedules app?
There are 2 correct answers too this question.
It is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.
It is a tool to analyze the schedule of operations in a graphical chart.
It is a tool for dispatching, rescheduling, or deallocating operations not only on pacemaker works centers but on all work centers in a defined area of responsibility.
It is a tool for dispatching, rescheduling, or deallocating several bottleneck operations on pacemaker work centers simultaneously in a graphical chart.
√ It is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.
√ It is a tool to analyze the schedule of operations in a graphical chart.
In which SAP S/4HANA version was the production planning and detailed scheduling (PP-DS) component introduced?
1709
1909
1511
1610
√ 1909
What does it mean for the production planner when MRP works with infinite capacities?
MRP creates capacity requirements only if the work center has sufficient capacity.
MRP creates capacity requirements without checking the capacity of a work center.
MRP assigns capacity requirements automatically after the last scheduled order on a work center.
MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
√ MRP creates capacity requirements without checking the capacity of a work center.
Coupling of production lines is not in focus. On the contrary, with the help of the other three measures, decoupling, and creation of strategic safety stock is in focus of DDR.
It ensures sustainable material flow.
It provides complete demand transparency.
It focuses on strategic buffer positioning at certain decoupling points.
It helps maintain break-even profits.
√ It ensures sustainable material flow.
√ It provides complete demand transparency.
√ It focuses on strategic buffer positioning at certain decoupling points.
Which alternative unit of measure is used for ordering the material and is the default unit for purchasing functions?
Order unit
Production unit
Sales unit
√ Order unit
On which of the following levels can you influence the availability check for the components of production orders?
MRP controller
Material master
Production controller
√ Production order type
√ Material master
Which of the following planning strategies are make-to-stock strategies?
Production by lot size
Planning with final assembly
Planning without final assembly
Planning at assembly level
√ Production by lot size
√ Planning with final assembly
√ Planning at assembly level
A production order is created from a planned order. The system should determine a valid production version. What must you doing the system for the selection to occur?
Change the production version assignment in the production order using the Read Master Data function.
Create several production versions with valid dates.
Set the customizing setting Manual Selection of Production Version active.
Set the customizing setting Automatic Selection of Production Version active.
√ Set the customizing setting Automatic Selection of Production Version active.
In the SAP Fiori launchpad, how can the end user add or remove apps?
Select the home page of the SAP Fiori launchpad.
Use the theme designer menu in the SAP Fiori launchpad.
Select the Edit Home Page option in the user actions menu.
Right-click on the SAP Fiori launchpad and select the Add/Remove Apps option.
√ Select the Edit Home Page option in the user actions menu.
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
First in first out (FIFO)
By usage probability
100% check
Simultaneous
√ By usage probability
√ 100% check
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Material Master –> MRP Group –> Plant Settings
MRP Group –> Material Master –> Plant Settings
Plant Settings –> MRP Group –> Material Master
Material Master –> Plant Settings –> MRP Group
√ Material Master –> MRP Group –> Plant Settings
Which functional capabilities does the Detailed Scheduling Board have?
Enter time-ticket confirmation for production orders
Undo for drag & Drop planning activities
Change planned order quantities
Change sales order quantities
√ Undo for drag & Drop planning activities
√ Change planned order quantities
Which supply chain planning components can you find in SAP S/4HANA?
Supply Chain Control Tower
Capacity Requirements Planning
Advanced Planning
Supply Network Planning
√ Capacity Requirements Planning
√ Advanced Planning
What are typical characteristics of make-to-order production?
Unrestricted use stock
Sales order specific stock
Sales order specific procurement
Planned independent requirements for a finished product trigger its production
√ Sales order specific stock
√ Sales order specific procurement
What are all the activities performed when you post GI?
Component stock/inventory will be reduced (both at the storage location and plant level).
Consumption statistics will be updated with the GI quantity.
With GI posting, the material document will be created, but the finance postings will happen only after the final confirmation of the production order.
The reservation is increased by the GI quantity.
√ Component stock/inventory will be reduced (both at the storage location and plant level).
√ Consumption statistics will be updated with the GI quantity.
Which characteristics should a material have for re-order point planning?
Replenishment lead time is known and relatively constant.
Demand remains relatively constant.
Material replenishment is managed by the vendor (VMI).
Seasonal demand is relatively volatile
√ Replenishment lead time is known and relatively constant.
√ Demand remains relatively constant.
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
Expected goods receipt
Yard Management
Handling Unit Management
Labor Management
Slotting
√ Expected goods receipt
√ Labor Management
√ Slotting
In SAP S/4HANA, the production version is a mandatory object and is the primary source of supply for in-house production. Which statement is correct?
Only the routing validity period should be within the validity period of the production version; the BOM validity period isn't a concern.
SAP decided to roll back the decision of the production version as the source of supply for manufacturing from SAP S/4HANA release 2020.
The routing and BOM selected for the production should not be set to the Deletion flag.
The lot-size range of the production version can be over the lot-size range of routing.
√ The routing and BOM selected for the production should not be set to the Deletion flag.
Which of the following steps of order execution generates financial postings?
Order release
Material staging
Material availability check
Goods receipt
√ Material staging
√ Goods receipt
Which of the following statements are correct?
You can only print the shop papers in the background.
Original print and reprint are the two modes available for printing.
The shop floor papers are classified as operation-related slips, component-based slips, and multipurpose slips.
You can print the papers when the order is in Created status.
√ Original print and reprint are the two modes available for printing.
√ The shop floor papers are classified as operation-related slips,
component-based slips, and multipurpose slips.
What data processing steps are obsolete if you use SAP S/4HANA Analytics?
Extract on, transformation, and loading (ETL)
Online transaction processing (OLTP)
Online analytical processing (OLAP)
Pre computed aggregation views
√ Extract on, transformation, and loading (ETL)
√ Pre computed aggregation views
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
Specify a negative offset time in the strategy profile.
Specify a positive planning horizon in the strategy profile.
Specify a positive offset time in the strategy profile.
Specify a negative planning horizon in the strategy profile.
√ Specify a negative offset time in the strategy profile.
During the greenfield implementation of SAP S/4HANA 2020, your key user informed you of the business requirement to capture electricity and water consumption confirmation of operations in the order, apart from setup, machine, and labor time.
Which master data object will you set up for this pur-pose?
Work Center - Capacity categories for electricity and water consumption
Work Center - Standard value with appropriate keys
The electricity and water consumption costs can be captured as overheads with the management accounting component.
Work Center - Default values
√ Work Center - Standard value with appropriate keys
What information is included in the SAP Readiness Check result for SAP S/4HANA?
Inconsistent data tables
Relevant simplification items
Recommended SAP Fiori apps
Recommended SAP Best Practices
Custom code analysis
√ Relevant simplification items
√ Recommended SAP Fiori apps
√ Custom code analysis
Which indicator in the material master record determines whether a component is procured for a specific sales order stock?
Individual/coll. requirement of the component
MRP type of components
Mixed MRP indicator of the finished product
Availability check of the finished product
√ Individual/coll. requirement of the component
A customer wants to display the planned order and production orders in the DS board in different colors. In which DS board profile can the required setting be done?
DS strategy profile
Planning board profile
Heuristic profile
Production planning strategy profile
√ Planning board profile
Which kinds of heuristics exist in SAP S/4HANA PP/DS?
Process Control Heuristics
Service Heuristics
Performance Heuristics
Product Heuristics
√ Process Control Heuristics
√ Service Heuristics
√ Product Heuristics
How is capacity planning for bottleneck resources integrated to MRP Live?
Capacity planning is generally not required after MRP Live planning.
Capacity planning is integrated in MRP Live and done simultaneously.
Capacity planning is only possible using the SCM-APO component PP/DS.
Capacity planning is done after MRP Live has calculated the capacity requirements.
√ Capacity planning is done after MRP Live has calculated the capacity requirements.
With reference to GR, which statements are correct?
The Delivery Completed indicator in the Goods Receipt tab page of the production order is set after the GR for the full quantity is posted.
With GR, the system updates the Delivered Quantity field in the production order.
Confirmation is the prerequisite step before GR. You can post GR for the quantity you finally confirmed.
The automatic GR can be posted only with final confirmation. With partial confirmation, automatic GR won't be posted.
GR can be manually or automatically posted for an order.
√ The Delivery Completed indicator in the Goods Receipt tab page of the production order is set after the GR for the full quantity is posted.
√ With GR, the system updates the Delivered Quantity field in the production order.
√ GR can be manually or automatically posted for an order.
Capacity Leveling: Which of the following are plausible when using dispatching sequences and methods for setup time optimization?
There 2 correct answers to this question.
Automatic adjustment of the setup matrix entries
Always a feasible production plan
Automatic adjustment of setup times in planning
Dispatching several operations without gaps and in a sequence
√ Automatic adjustment of setup times in planning
√ Dispatching several operations without gaps and in a sequence
Which information is required when you create a product master in SAP S/4HANA?
Base unit of measure
Selection screen for views
Industry sector
Product type
√ Base unit of measure
√ Product type
In which customizing activity do you set up automatic routing selection for production orders?
Define order-type-dependent parameter
Define selection profiles
Define production scheduling profile
Define scheduling parameters for production orders
√ Define order-type-dependent parameter
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
Manual planning without check
Consumption-based planning
Forecast planning
Material requirements planning
√ Consumption-based planning
Which of these is a valid control recipe destination?
Download to external system, initiated by external process control
Transfer to browser-based PI sheet
All of the above
Download to external system, initiated by SAP process management
Transfer to ABAP list-based PI sheet
√ All of the above
Which of the following are valid components of SAP Integrated Business Planning?
IBP for Statistical Forecasting
IBP for Inventory
IBP for Response and Supply
IBP for Purchasing
√ IBP for Inventory
√ IBP for Response and Supply
The Mixed MRP indicator is used in conjunction with which of the planning strategies?
Subassembly planning strategies
Gross requirements planning
Net requirements planning
MTO planning
√ Subassembly planning strategies
√ Gross requirements planning
Which of the following apply to MRP Live?
The BAdIs for classical MRP also apply to MRP Live.
The sequence of planning materials is calculated across plants.
Planned orders need to be converted to purchase requisitions for externally
procured materials.
The definition of the planning scope is more flexible.
√ The sequence of planning materials is calculated across plants.
√ The definition of the planning scope is more flexible.
How can you carry out cost object controlling for production orders?
Milestone-related
Order-related
Product-related
Cost-related
√ Order-related
√ Product-related
You’re into an SAP S/4HANA greenfield implementation project and you're discussing the master data with the business team. Which of the following statements related to the production version are correct?
Sourcing logic is consistent for PP-DS and MRP.
All of the above are true.
Production versions can be created based on the specified quantity range and validity period.
In comparison to SAP ERP, the production version is mandatory master data in SAP S/4HANA for in-house production and subcontracting.
BOM will be selected for MRP based on the production version.
√ All of the above are true.
In the stock requirements list, planned orders created within the Preplanning segment have a special type VP. Which planning strategies are associated with this special planned order type VP?
Please select all the correct answers that apply.
Planning without final assembly (Strategy 50)
Planning with a planning material and without MTO (Strategy 63)
Planning with a planning material (Strategy 60)
Planning without Final Assembly and without MTO (Strategy 52)
√ Planning without final assembly (Strategy 50)
√ Planning with a planning material and without MTO (Strategy 63)
√ Planning with a planning material (Strategy 60)
√ Planning without Final Assembly and without MTO (Strategy 52)
Which of the following processes lead to an entry in the MRP planning file?
Change of the material’s procurement type
Creation of dependent requirements
Creation of a sales order
Creation of a purchasing contract
Change of the storage bin
√ Change of the material’s procurement type
√ Creation of dependent requirements
√ Creation of a sales order
Which of the following are alert types in PP/DS?
Capacity alerts
Alerts to update the time series
Quantity alerts
Date and time alerts
√ Capacity alerts
√ Quantity alerts
√ Date and time alerts
Which data model changes have been implemented in Sales and Distribution?
Elimination of output condition tables
Elimination of status tables
Elimination of document index tables
Elimination of customer master tables
Elimination of LIS tables for rebates
√ Elimination of status tables
√ Elimination of document index tables
√ Elimination of customer master tables
What are some of the SAP Fiori user types?
Business partner
Developer
Employee
Occasional
Expert
√ Developer
√ Occasional
√ Expert
What are the three transition scenarios for an S/4HANA implementation?
System activation
Landscape transformation
System upgrade
New implementation
System conversion
√ Landscape transformation
√ New implementation
√ System conversion
Which statements are correct for phantom assemblies?
Special procurement key 50 is used to define a material as a phantom assembly.
Phantom assemblies are used to group components together.
Phantom assemblies behavior can't be overwritten in the BOM.
Phantom assemblies are planning relevant.
Components in the phantom assemblies are aligned to the superior assembly.
√ Special procurement key 50 is used to define a material as a phantom assembly.
√ Phantom assemblies are used to group components together.
√ Components in the phantom assemblies are aligned to the superior assembly.
Which of the following elements does MRP take into account during net requirement calculation?
Maximum stock level
Purchase orders
Safety stock
Lot size
√ Safety stock
√ Lot size
When would you use reporting point backflush in repetitive manufacturing?
For production lines with short lead times
You require an up-to-date inventory for components
When goods issues can wait for final confirmation
When you need to determine the work in progress
√ You require an up-to-date inventory for components
√ When you need to determine the work in progress
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated?
The requirements date occurs that of a firmed planned receipt
A firmed planned receipt cannot be rescheduled
The requirements date occurs before that of a firmed planned receipt
The requirement no longer exists
√ The requirements date occurs before that of a firmed planned receipt
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?
Add the agreement to the source list and mark it for MRP relevance
Add the agreement to the quota arrangement and mark it for MRP relevance.
Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
√ Add the agreement to the source list and mark it for MRP relevance
√ Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
Production orders are used for what production type?
Discrete manufacturing processes
Process manufacturing processes
Period and quantity-oriented production
Replenishment controlled by control cycles
√ Discrete manufacturing processes
Which statements are correct with reference to BOMs?
Phantom assemblies will have the technical type P.
The system will assign a low-level code for each material in the BOM structure.
Net ID should be checked if the component is the same as the higher-level assembly.
The BOM status shows which application areas the BOM can be used in.
√ The system will assign a low-level code for each material in the BOM structure.
√ The BOM status shows which application areas the BOM can be used in.
Which of these are layers in SAP Best Practice content?
Building blocks
Configuration guides
Solution packages
Process diagrams
Scope items
√ Building blocks
√ Solution packages
√ Scope items
Which statements are correct for an MRP Live planning run?
With simplifications to SAP S/4HANA, in a regenerative planning run, MRP plans only the materials that have undergone planning-relevant changes.
MRP Live executes net change planning when regenerative planning option isn't selected.
Stock net-off across plants is one of the benefits of an MRP Live run.
Unlike a classic MRP run, an MRP Live run won't store the information related to planned materials and messages.
√ MRP Live executes net change planning when regenerative planning option isn't selected.
In which of the following master data objects can you define the production order default storage location for a material component?
Work center, in the production supply area
Routing, in the component allocation
Material master of the finished product
BOM, in the item for the material
√ Work center, in the production supply area
√ BOM, in the item for the material
What are possible configuration steps when setting up the alert monitor in Advanced Planning?
Create object selection variant for resource-related alerts
Assign the overall profile to the authorization profile.
Create object selection variant for transportation lane-related alerts.
Create object selection variant for product-related alerts.
Assign the alert profile to the overall profile.
√ Create object selection variant for resource-related alerts
√ Create object selection variant for product-related alerts.
√Assign the alert profile to the overall profile.
Which secure storage areas exist for document management?
FTP server
RFC server
HTTP content server
√ HTTP content server
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
Squeezing
Insert operation
Find slot
Scheduling working time only
√ Find slot
You can trigger which of the following business functions using the production scheduling profile?
Confirm available partial quantity
Generate control recipe at release
Assign a default inspection type
Activate back flushing
√ Confirm available partial quantity
√ Generate control recipe at release
How does new Inventory Management Data model contribute to the reduction of the data footpint?
By eliminating inventory history tables
By eliminating fields for different stock types
By eliminating material master tables
By eliminating inventory tables
By eliminating hybrid tables
√ By eliminating inventory history tables
√ By eliminating fields for different stock types
√ By eliminating inventory tables
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?
Change the special procurement key of the phantom assembly in the BOM
.
Change the item category of the phantom assembly in the BOM.
Change the phantom item indicator for the phantom assembly in the BOM.
Change the explosion type of the phantom assembly in the BOM.
√ Change the explosion type of the phantom assembly in the BOM.
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Outbound delivery order
Warehouse order
Warehouse task
Outbound delivery request
√ Outbound delivery request
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
MRP Live can plan materials with recursive BOMs
MRP Live can create production orders automatically
MRP Live can priorities demand from sales orders
MRP Live can propose alternative solutions
√ MRP Live can propose alternative solutions
Which of the following consists of interoperation times of an operation?
Setup time
Queue time
Processing time
Wait time
Move time
√Queue time
√ Wait time
√ Move time
Based on which object does production with repetitive manufacturing take place?
Process order
Purchase requisition
Planned order
Production order
√ Planned order
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?
The production operator cannot enter additional confirmations
The buyer can still see component reservations
The warehouse clerk still carry out goods issue transactions
The production manager can still see the capacity requirements
√ The production operator cannot enter additional confirmations
How can you enhance the system statuses of a production order scenario with user statuses?
By defining a status profile and assigning it to the order type
By enhancing the system status customizing table with user statuses
By creating a user profile and assigning it to the production scheduling
Profile
By activating the user statuses in status and action management
√ By enhancing the system status customizing table with user statuses
Which of the following planning strategies is a make-to-order strategy?
√ Planning without final assembly
During an SAP S/4HANA implementation project, the production and operations team wanted to implement discrete manufacturing, but the finance and management accounting teams wanted to simplify the finance and month end closing processes by implementing cost object controlling by period method.
Which statements are correct?
If the manufacturing process is workshop based, then implement the production order scenario, and if cost object controlling is order based, costs are managed at the order header level, and a settlement rule is assigned there.
For the production order scenario, product cost by period can't be implemented.
If the manufacturing process represents repetitive manufacturing (REM), then implement REM and cost object controlling by period can be implemented.
Cost object controlling by period for the production order scenario can be implemented by maintaining the use of the product cost collector (PCC) as a cost object.
√ If the manufacturing process is workshop based, then implement the production order scenario, and if cost object controlling is order based, costs are managed at the order header level, and a settlement rule is assigned there.
√ If the manufacturing process represents repetitive manufacturing (REM), then implement REM and cost object controlling by period can be implemented.
√ Cost object controlling by period for the production order scenario can be implemented by maintaining the use of the product cost collector (PCC) as a cost object.
For productions orders, cost object controlling (COC) can be carried out on an order related or product-related basis. Which of the following do you have to consider?
Order-related COC is beneficial in a flexible production environment.
In order related COC, individual production orders do not have cost
segments.
In product-related COC, all costs are debited and credited to a product cost collector.
Product related COC is used in manufacturing for co-products.
√ Order-related COC is beneficial in a flexible production environment.
√ In product-related COC, all costs are debited and credited to a product cost collector.
Which task list types can have parallel sequences?
Rate routings
Routings (N)
Reference operation sets (S)
Master recipes (2)
√ Rate routings
√ Routings (N)
Which information is required when you set up an order type?
Automatic actions an order release
Over delivery tolerance limit
Settlement profile
Production supervisor
√ Settlement profile
Which transaction code can you use in SAP S/4HANA to enter and display goods movements?
MMBE
MB02
MBNL
MIGO
√ MIGO
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders”
Manually changing the quantity of a planned order
Creating a planned order within the planning time fence
Setting a planning time fence in the Material Master Record
Assigning a production scheduling profile
√ Manually changing the quantity of a planned order
√ Creating a planned order within the planning time fence
At which level does detailed scheduling (DS) heuristics plan?
Order
Product
Vendor
Resource
√ Resource
Last changed9 months ago