A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:
The warehouse clerk still carry out goods issue transactions
The production manager can still see the capacity requirements
The production operator cannot enter additional confirmations
The buyer can still see component reservations
√ The production operator cannot enter additional confirmations
How can you characterize dependent requirements in material requirements planning?
There are 2 correct answers to this question.
They are created on assembly level during the planning run.
They are created with exact times in advanced planning.
They are only created for multilevel BOM structure.
They are created when an independent requirement is created for the finished product.
√ They are created on assembly level during the planning run.
√ They are created when an independent requirement is created for the finished product.
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
Supply Network Planning (SNP)
Capacity Requirements Planning (CRP)
Demand Planning (DP)
Material Requirements Planning (MRP)
√ Material Requirements Planning (MRP)
Where do you maintain the work center that represents the production line for repetitive manufacturing?
Production cost collector
Production version
Routing
Repetitive manufacturing profile
√ Production version
√ Routing
Which statements are correct with reference to the Schedule Production app?
There are 3 correct answers to this question.
This app is applicable only for pacemaker or bottleneck work center.
Planning Mode can be selected flexibly between Bucket and Sequence.
You can have more than one work center as a bottleneck work center.
Only the Chart view is available for this app.
You can perform dispatch, deallocate, and reschedule of operations.
√ This app is applicable only for pacemaker or bottleneck work center.
√ Planning Mode can be selected flexibly between Bucket and Sequence.
√ You can perform dispatch, deallocate, and reschedule of operations.
Which of the following are types of SAP Fiori apps available only on SAP HANA?
Analytical apps
Transactional apps
Environmental apps
Fact sheet apps
√ Analytical apps
√ Fact sheet apps
At which level does detailed scheduling (DS) heuristics plan?
Product
Order
Resource
Vendor
√ Resource
With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud implementation?
Configure Your Solution
Manage Licenses
Maintain Business Catalogs
Manage Your Solution
√ Manage Your Solution
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?
Use a specific MRP type.
Use a specific MRP controller.
Use a specific material group
Use a specific material status.
√ Use a specific MRP type.
√ Use a specific MRP controller.
Which of the following steps of order execution generates financial postings?
Material availability check
Material staging
Goods receipt
Order release
√ Material staging
√ Goods receipt
Which of the following functions can be performed with a REM planning table?
Planned orders can be created.
Component backflush can be performed.
Production orders can be created.
Final confirmations can be performed.
Planned order quantities can be dispatched.
√ Planned orders can be created.
√ Production orders can be created.
√ Planned order quantities can be dispatched.
When do you recommend the use of repetitive manufacturing?
High product complexity
Low product stability
Low product complexity
High product stability
√ Low product complexity
√ High product stability
Which options are available for an SAP S/4HANA deployment?
SAP S/4HANA private cloud
SAP S/4HANA Professional services cloud
SAP S/4HANA on premise
SAP S/4AHANA Enterprise Management cloud
√ SAP S/4HANA private cloud
√ SAP S/4HANA on premise
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Outbound delivery request
Outbound delivery order
Warehouse task
Warehouse order
√ Outbound delivery request
What determines whether the planned independent requirements in demand management are consumed by other requirements?
Requirements profile
Requirements type
Consumption sequence procedure
Order type
√ Requirements type
What is the difference between the earliest dates and latest dates of an operation?\
Processing time
Setup time
Queue time
Teardown time
Wait time
√ Queue time
Which of the following statements are true for make-to-stock production?
Sales orders always trigger production.
Sales orders are fulfilled by anonymous warehouse stock.
Planning assemblies can be combined with the make-to-stock concept.
Planned independent requirements always trigger assembly.
√ Sales orders are fulfilled by anonymous warehouse stock.
√ Planning assemblies can be combined with the make-to-stock concept.
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
Floating time
Tear down time
Move time
√ Processing time
√ Tear down time
During the greenfield implementation of SAP S/4HANA 2020, your key user informed you of the business requirement to capture electricity and water consumption confirmation of operations in the order, apart from setup, machine, and labor time.
Which master data object will you set up for this pur-pose?
Work Center - Capacity categories for electricity and water consumption
Work Center - Default values
The electricity and water consumption costs can be captured as overheads with the management accounting component.
Work Center - Standard value with appropriate keys
√ Work Center - Standard value with appropriate keys
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
When you create a planned order
When the MRP results are saved
When you create a sales order
When you deliver a sales order
√ When you create a sales order
Which indicator in the material master determines if a material is relevant for advanced planning?
Availability check of the finished product
Individual/collective requirement
MRP type of material
Advanced Planning indicator
√ Advanced Planning indicator
Which supply chain planning components can you find in SAP S/4HANA?
Supply Network Planning
Capacity Requirements Planning
Advanced Planning
Supply Chain Control Tower
√ Capacity Requirements Planning
√ Advanced Planning
The planning strategy requires the entry of planned independent requirements at the subassembly level, so the in-house production of this component can be triggered before a finished goods sales order is received?
Planning with final assembly
Planning without final assembly
Gross requirements planning
Planning at assembly level
√ Planning at assembly level
Which functional capabilities does the Detailed Scheduling Board have?
Change planned order quantities
Enter time-ticket confirmation for production orders
Undo for drag & Drop planning activities
Change sales order quantities
√ Change planned order quantities
√ Undo for drag & Drop planning activities
Which of the following statements are true regarding the material master?
The material type determines the screen sequence, material number assignment, and procurement type.
Maintaining the material master is a collective responsibility of different departments in an organization.
It’s always possible to change the industry sector of a material after you assign it.
It’s possible to set the industry sector as default but not possible to set views and organization levels as default.
√ The material type determines the screen sequence, material number assignment, and procurement type.
√ Maintaining the material master is a collective responsibility of different departments in an organization.
What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
Scope Items
Building Blocks
Solution Package
Process Flows
Test Scripts
√ Scope Items
√ Building Blocks
√ Solution Package
A planner is trying to move an order from one resource to another, but gets an error. What caused the error? The resource to which planner is moving the order to:
Isn't maintained in the routing operation (PDS) of the material in PP-DS.
Isn't a finite scheduling resource.
Has a mode priority maintained as “B”.
Is maintained as an alternate resource to the resource where the order currently exists.
√ Isn't maintained in the routing operation (PDS) of the material in PP-DS.
The Mixed MRP indicator is used in conjunction with which of the planning strategies?
Subassembly planning strategies
MTO planning
Net requirements planning
√ Subassembly planning strategies
√ Gross requirements planning
What are the properties of MRP Live?
It uses the same BADIs as classic MRP
It is executed on the database server
Data is read sequentially from the database tables
The code is written in SQL Script
√ It is executed on the database server
√ The code is written in SQL Script
How can SAP S/4HANA support a GMP compliant production process?
Documentation of quality data with Quality Management
Predefined GMP compliant process order types to meet audit requirements
Use of the GMP compliant flag in relevant master data applications
Recipe approval with Engineering Change Management
Use of the digital signature function to check and run business processes
√ Documentation of quality data with Quality Management
√ Recipe approval with Engineering Change Management
√ Use of the digital signature function to check and run business processes
What does the bill of material usage (BOM usage) control at the BOM item level?
Maximum allowed low-level code
Default unit of measure
Default values for the item status
Allowed material type
√ Default values for the item status
√ Allowed material type
Which of the following is a valid sequence of the main activities in product on order processing?
Creation, scheduling, release, material withdrawal, confirmation
Creation, staging, release, material withdrawal, confirmation
Creation, scheduling, release, variance calculation, confirmation
Creation, release, scheduling, material withdrawal, confirmation
√ Creation, scheduling, release, material withdrawal, confirmation
Which materials have a negative quantity in a bill of materials or in a recipe?
Co-products
Bulk materials
Continuous flow materials
By-products
Waste products
√ Co-products
√ By-products
√ Waste products
You are using the document management system (DMS). Where should the DMS document links be assigned, to have them automatically copied to production orders?
Routing header
Material master
Work center
Bill of material
√ Material master
√ Bill of material
Which of the following are master data for production?
Sales order
Production order
√ Work center
What are new feature of SAP S/4HANA with regard to MRP?
Consumption mode “Consumption in own period”
Automated MRP run
Finite MRP planning by default
MRP live
√ Consumption mode “Consumption in own period”
√ MRP live
What are attributes of the SAP S/4HANA Simplification list?
It was created for better planning and estimation of your way to S/4HANA
It contains references to the relevant training material
It details transaction and solution capabilities at a functional level
It is only a grouping of related technical simplifications
It can have a business and a technical impact
√ It was created for better planning and estimation of your way to S/4HANA
√ It details transaction and solution capabilities at a functional level
√ It can have a business and a technical impact
Where can you find the latest in version of the Simplification List for SAP S/4HANA?
SAP Solution Manager 7.2
SAP Help Portal
SAP Support Portal
SAP Best Practices Explorer
√ SAP Help Portal
Which task list types can have parallel sequences?
Master recipes (2)
Reference operation sets (S)
Routings (N)
Rate routings (R)
√ Routings (N)
√ Rate routings (R)
The production is based on the forecast for finished product, and the stock is expected to be available in inventory before the customer order. You want to quickly react to the customer requirement by increasing the production.
Which planning strategy should be selected?
Planning strategy 70: Planning at assembly level
Planning strategy 40: Planning with final assembly
Planning strategy 20: Make-to-order production
Planning strategy 50: Planning without final assembly
√ Planning strategy 40: Planning with final assembly
What are benefits of the Engineering Workbench?
Detailed selection of bill of materials (BOM)items and operations
Simulation of planned changes for costing and mater all requirements planning
Simultaneous processing of different bill of materials (BOM) items and operations
Undo/redo functionality of planned changes
√ Detailed selection of bill of materials (BOM)items and operations
√ Simultaneous processing of different bill of materials (BOM) items and operations
Which of following can be created or changed by the PP-DS planning runs automatically or manually?
Purchase orders
Quality management inspections lots
Plant maintenance orders
Purchase requisitions
Stock transfer reservations
√ Purchase requisitions
√ Stock transfer reservations
Which of the following belong to supply chain master data objects?
Account
Distribution center
Product cost collector
√ Vendor
√ Distribution center
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version?
MRP Profile
MRP Controller
Plant Data
MRP Group
√ MRP Group
Operations can be rescheduled from a resource to an alternate resource using which of the following ways?
Attaching a production note to the PDS
Manual drag and drop
Using a PDS with multiple modes
Selecting a different PDS using a heuristic
√ Manual drag and drop
√ Using a PDS with multiple modes
√ Selecting a different PDS using a heuristic
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed?
Run setup minimization heuristics or optimizer.
Create and assign a new graphical object for setup time in the planning board.
Create and assign a setup matrix with setup transition time to the resource
Create and assign setup group/setup keys in the production data structure.
√ Create and assign a new graphical object for setup time in the planning board.
√ Create and assign a setup matrix with setup transition time to the resource
What is the purpose of collective orders?
To combine order management of co-products and by-products with the main product
To post production costs on a cost collector instead of the production order
To manage production orders for an entire finished production multiple levels
To post any component withdrawals single back flush with order confirmation
√ To manage production orders for an entire finished production multiple levels
What does the material type influence?
Which plant specific status is allowed
Whether the material is produced in-house, procured externally or both
Which material master views can be maintained
Which document types are allowed
√ Which material master views can be maintained
√ Which document types are allowed
Capacity Leveling: In which of the following situations is the dispatch of an operation likely to be cancelled?
When the desired dispatching time of an operation coincides with an operation that is already dispatched.
When an operation is shifted out of a planning period
When there is a critical bottleneck for a work center
When inserting an operation infinitely fails due to lack of capacity
√ When an operation is shifted out of a planning period
Which of the following are production master data objects in the supply chain?
Bill of materials
General ledger
√ Bill of materials
In comparison between classic MRP and MRP Live, which planning mode is removed in MRP Live?
Delete and Recreate Planning Data
Adapt Planning Data (Normal Mode)
Reexplode BOM and Routing
√ Reexplode BOM and Routing
The __________ is the highest hierarchical level in the SAP S/4HANA application.
Company code
Plant
Storage location
Client
√ Client
What are properties of MRP Live?
Which of the following functions can be performed when the production order has the status “Created” (CRTD)?
A user can trigger material staging via mass processing (transaction COHV).
A user can schedule a background job to release production orders (transaction COOIS).
A user trigger material availability check via mass processing (transaction COHV)
A user trigger printing of shop floor paper manually (transaction CO02).
√ A user can trigger material staging via mass processing (transaction COHV).
What are the three transition scenarios for an S/4HANA implementation?
System activation
System conversion
New implementation
Landscape transformation
System upgrade
√ System conversion
√ New implementation
√ Landscape transformation
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
Use the MRP type for vendor managed inventory.
Use the minimum order quantity.
Use the reorder point.
Use the fixed lot size procedure.
√ Use the fixed lot size procedure.
For productions orders, cost object controlling (COC) can be carried out on an order related or product-related basis. Which of the following do you have to consider?
Order-related COC is beneficial in a flexible production environment.
In order related COC, individual production orders do not have cost segments.
Product related COC is used in manufacturing for co-products.
In product-related COC, all costs are debited and credited to a product cost collector.
√ Order-related COC is beneficial in a flexible production environment.
√ In product-related COC, all costs are debited and credited to a product cost collector.
What are some of the advantages of using Kanban?
It is mostly accomplished by manual postings
Replenishments are created close to the actual need
Replenishments are based on centralized planning
It is a simplified form of production control
√ Replenishments are created close to the actual need
√ It is a simplified form of production control
Which of the following is correct for reference operation sets?
You can assign PRTs to a reference operation set.
Parallel and alternative sequences are allowed for a reference operation set.
Operations that are standard for several task lists/routings can be defined as reference operation sets.
Reference operation sets allow only the standard sequence.
√ You can assign PRTs to a reference operation set.
√ Operations that are standard for several task lists/routings can be defined as reference operation sets.
√ Reference operation sets allow only the standard sequence.
Which of the following MRP types belongs to consumption-based planning?
MPS - Master production scheduling
VB - Reorder point planning
PD - Material requirements planning
√ VB - Reorder point planning
What statements are true concerning a plant?
Product costing can be performed across plants.
A plant/division combination can be assigned to only one business area.
Several purchasing organizations can be assigned to a plant.
A plant can belong to many company codes.
√ Product costing can be performed across plants.
√ A plant/division combination can be assigned to only one business area.
√ Several purchasing organizations can be assigned to a plant.
What are Planned Independent Requirements?
They are real sales figures
They are anonymous demand elements
They are placeholders for sales orders
They are customer independent requirements
√ They are anonymous demand elements
√ They are placeholders for sales orders
What is a work center hierarchy in SAP S/4HANA capacity planning?
A group of work centers in a production line being used in sequence for production
A group of alternative work centers providing a cumulative available capacity for production
A group of alternative work centers for production, structured in hierarchy levels by priorities
A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
√ A group of alternative work centers providing a cumulative available capacity for production
How can you carry out cost object controlling for production orders?
Cost-related
Order-related
Product-related
Milestone-related
√ Order-related
√ Product-related
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
With respect to a common change status for product and each assembly
With respect to a common key date for product and each assembly
With respect to a defined separate change status for product and each assembly
With respect to defined separate key dates for product and each assembly
√ With respect to a common key date for product and each assembly
How can you achieve a feasible production plan in case of capacity constraints?
Execute a new production planning run.
Adjust the available capacity.
Reduce the planning window.
Select an alternative mode on a resource.
Form optimum sequences to reduce setup times
√ Adjust the available capacity.
√ Select an alternative mode on a resource.
√ Form optimum sequences to reduce setup times
Which of the following time elements does MRP use during backward scheduling for in-house production?
Planned delivery time
Goods receipt processing time
Opening period
Planning time fence
√ Goods receipt processing time
√ Opening period
You want to use capacity availability checks for production orders. Which settings have to be made for this?
The PRT Availability Check must be set in the checking control
.
The Relevant for Finite Scheduling indicator must be set.
A checking rule must be assigned in the checking control.
An overall profile must be assigned in the checking control.
√ The Relevant for Finite Scheduling indicator must be set.
√ An overall profile must be assigned in the checking control.
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potentials crap of the high-value material?
Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.
Enter the component scrap in the material
master of the assembly and set the net indicator in the routing operation where the component is used
Enter the operation scrap and set the net indicator in the component of the bill of mater al of the assembly.
Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.
√ master of the assembly and set the net indicator in the routing operation where the component is used
Which characteristics should a material have for re-order point planning?
Seasonal demand is relatively volatile
Material replenishment is managed by the vendor (VMI).
Demand remains relatively constant.
Replenishment lead time is known and relatively constant.
√ Demand remains relatively constant.
√ Replenishment lead time is known and relatively constant.
What are examples of assignment objects you can maintain in the Engineering Workbench?
Routing to sequence assignment
Material to production version assignment
Material to routing assignment
Material to bill of materials (BOM) assignment
Component assignment
√ Material to routing assignment
√ Material to bill of materials (BOM) assignment
√ Component assignment
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available?
Resource overview
Resource utilization
Order list
Production list
√ Resource utilization
√ Order list
When will the load on the capacities reduced?
With the operation confirmation
If you lock an order (LKD)
If you set the order status to DISP
If the order status is set to TECO
With MSPT status
√ With the operation confirmation
√ If you lock an order (LKD)
√ If the order status is set to TECO
Which time elements can be reduced by a reduction strategy?
Float after production
√ Wait time
√ Move time
Which information is required when you create a product master in SAP S/4HANA?
Selection screen for views
Base unit of measure
Industry sector
Product type
√ Base unit of measure
√ Product type
Which are the key features of SAP HANA?
Compression
Parallelization
In-memory
SAP Fiori
√ Compression
√ Parallelization
√ In-memory
In the Schedule Production app, which settings can you make in the planning strategy?
Finiteness level (0...1)
Direction (forward/backward)
Scheduling control (finite/infinite)
Fixed pegging (on/off)
Planning mode (bucket/sequence)
√ Direction (forward/backward)
√ Scheduling control (finite/infinite)
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/OS)?
Use a Propagation range.
Use a resource group.
Use a heuristic.
Use a planning group.
√ Use a resource group.
You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of the following order types consume the forecast?
Purchase order
Dependent demand
Planned order
√ Sales order
√ Dependent demand
Question:
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Plant Settings –> MRP Group –> Material Master
Material Master –> Plant Settings –> MRP Group
Material Master –> MRP Group –> Plant Settings
MRP Group –> Material Master –> Plant Settings
√ Material Master –> MRP Group –> Plant Settings