Control during production
Real-time control of the production output, to check whether process is in control (use of control charts).
More desirable since it gives the possibility to notice and adjust the process within a short time
Acceptance control
Inspection of the products received by the supplier and decision whether to accept or refuse them
Supplier can be external or internal
At which point of the production process: acceptance control can be performed?
(p. 3)
Outgoing inspection
inspection is performed immediately following production.
Incoming inspection
lots of products are inspected as they are received from the supplier.
Intermediate inspection
semi-finished products can be inspected before moving from one shop to another, within the same factory
What are the purposes of Acceptance control
(p. 4)
Checking the products’ (dimensional and functional) conformity to specifications
Estimate the percentage of defective elements (p).
Acceptance control can be performed by who
Can be performed by
customer
supplier
but inspection cost is generally charged to supplier.
Name the approaches to lot sentencing
100% inspection
Acceptance sampling
Accept with no inspection
Describe the following approache to lot sentencing
inspect every item in the lot, removing all defective units found
The advantage is that we are completely sure of the quality of the production output
Do not require statistics
a sample, which is a subset of the production output, is selected from the lot
then sample units are inspected with respect to a specific quality characteristic
On the basis of the sample information, the lot is then accepted or rejected
Do require statistics
It is useful in situations where the supplier’s process is very good, with almost no defective units
In which situations Acceptance sampling is used
(p. 5)
Testing is destructive
Cost of 100% inspection is extremly high
When a 100% inspection not feasible or require a lot of time
When the supplier has an excelent quality history
When the inspection error rate is high, so that a 100% inspection would cause a higher percentage of defective untis to be passed
Name the disatvanteges of Acceptance sampling
(p. 6)
Risk of accepting bad lots and rejecting good lots
Less information is generated
Requires planning and documentation (100% inspection does not)
Describe Acceptance sampling
the decision whether to accept or refuse the lot is made considering just a portion of the whole lot, using statistical techniques.
It can be interpreted as a hypothesis test
null hypothesis (Hp0) => “the supplier’s lot/material is good”.
Describe Acceptance sampling interpreted as hypothesis test
Null hypothesis (Hp0) => “the supplier’s lot/material is good”.
Type 1 error (alpha)
Player => Supplier
Risk => Seeing good lots being rejacted
alpha => risk of rejection of Hp0 when it is actually true
Type 2 error ( beta)
Player => Customer
Risk => Accepting bad quality lots
beta => risk of failing to reject Hp0 when it is actually false.
Classification of Sampling Plans
(p. 9)
For attributes:
the quality characteristic is expressed through a binary parameter (good/bad, conforming/non-conforming)
Can be classified into sampling plans:
for defectives => product that fail to meet specifications since they have one or more defects
for defects => nonconformities that are serious enough to significantly affect the safe/effective use of the product unit
For variables: the quality characteristic is measured on a continuous numerical scale (e.g., the length of a mechanical component)
Describe the Measuremnet of Attributes
(p. 10)
Measurements of attributes are
quicker and more practical than those of variables
but with lower information content
Example: In order to control the diameter of a metallic bar, we could use a hard gauge to check its conformity to specifications, or a calliper to determine its real diameter.
Definition of a Lot / Batch
(p. 11)
Group of units of the same product, which have been produced under homogeneous conditions
i.e., same machines, same operators, same materials, approximately in the same time
Descibe OC-Curves
(p. 19, 29)
The Operating Characteristic (OC) curve depicts the discriminatory power or severity or protection of the sampling plan, representing the probability of acceptance (Pa) as a function of the lot fraction nonconforming (p).
There are two types of OC curves:
Type-A when Pa is calculated referring to the Hypergeometric distribution;
Type-B when Pa is calculated referring to the Binomial (approx.) distribution.
The OC curve is a monotonically decreasing curve of Pa with respect to p, which asymptotically tends to 0.
The shape of the curve depend on the parameters that characterize the sampling plan (N, n, c).
If n<<N (or n/N ≤ 0.10), the two OC curves are virtually undistinguishable because the hypergeometric distribution is well approximated by the binomial one.
Describe the two perpectives of Sampling Plan designing
(p. 21)
Supplier wants to avoid that lots with relatively high quality are rejected
relatively lower p
Concept of Serverity => Sampling plan should not be too severe
Customer wants to avoid accepting lots with relatively low quality
relatively higher p
Concept of Protection => Sampling plan will need to adequately protect him/her from this risk
Describe the influence of n on the OC-Curve
(p. 22, 24)
The sample size (n) is a parameter affecting the OC curve significantly
While n increases, the curve approaches the ideal “step shape”
Step shape OC curve is acieved when: n → N (100% inspection)
Discriminates “good” and “bad” lots perfectly
for relatively low p values => 𝑃_𝑎 = 1
for larger p values => 𝑃_𝑎 = 0.
Increasing n will also make the sampling plan more expensive and time-consuming
Describe the influence of c on the OC-Curve
(p. 22, 23)
Sampling plans with small c values are more discriminatory for lower p values => OC curve in these cases are said to be more severe
The severity of a sampling plan is the propensity to obtain a relatively low 𝑃_𝑎 value for a given p value (defectiveness)
Describe the concept of severity
In the example, three different OC curves (with different c values) are intersected with a vertical line corresponding to p = 2%.
The 𝑃_𝑎 values of the three OC curve are radically different => 𝑃_𝑎(𝑐=2) >𝑃_y(𝑐=1) >𝑃_a(𝑐=0)
While the curve with c = 0 is relatively severe (fully convex), that one with c = 2 is relatively indulgent.
Describe the influence of N on the OC-Curve
(p. 26)
Nearly no impact
What is a common mistake in desgining Sampling Plans
(p. 27)
The use of a sample size that are a fixed percentage of the lot size (e.g., n/N = constant) is a conceptually wrong practice.
The reason is that n and N differently influence the OC-curve behaviour
Effect of n predominates with respect to that of N.
Consequence => severity of the OC curve vary in an uncontrolled manner
Describe alpha and beta in the OC-Curve
(p. 30)
beta => risk of failing to reject Hp0 when it is actually false
Describe the acceptable quality level (AQL)
(p. 31)
Name the rules of the rectifying inspection plan
(p. 40)
For each rejected lot (N), the inspection is extended from the sample (n) to the rest of the lot (N – n);
Any defective unit found during the inspection, both of the sample (irrespectie of acceptance or rejection) and the rest of the lot (N – n), must be removed from the lot and then replaced with a good/conforming unit.
Describe the of a double sampling Plan
(p. 72)
For double sampling plans two points of the OC-curve (AQL, 1 – a and LTPD, b) are not enough
there are only two equations for four unknown factors to be determined (i.e., n1, c1, n2 and c2).
Two additional equations can be added by imposing some (additional) constraints. The most common ones are
n2 = 2∙n1
c2 = 2∙c1 or c1 + c2 = const.
Describe continous Sampling Plans
(p. 79)
For skip-lot plans only some fractions of the submitted lots are inspected.
Generally, skip-lot sampling plans are used where it is necessary to reduce the average amount of inspection required
(p. 83)
When production is continuous (the product is not formed into lots) a segment of production can be conventionally marked off as a “lot”.
In this case – in order to avoid a 100% inspection – only a fraction of the units can be inspected.
These sample units are selected one at a time at random from the flow of production