Which of the following best describes the primary focus of Agile Project Delivery?
Please choose the correct answer.
Choose one:
Delivering only the documentation at the end of each sprint
Delivering based on the highest cost features first
Delivering small, incremental improvements to the client frequently
Delivering the entire project at once at the end of the project timeline
Which of the following is a key advantage of the SAP S/4HANA On-Premise edition over the Cloud editions?
Automatic quarterly updates
Reduced IT infrastructure costs
Greater flexibility in terms of customization and integration
No need for data migration
A company is considering SAP S/4HANA Cloud and wants a solution that provides regular updates, best practices, and minimal hands-on management. Which edition aligns with their requirements?
SAP S/4HANA Private Cloud
Neither edition offers automatic updates
Both editions provide the same management experience
SAP S/4HANA Public Cloud
You are asked to provide a high-level project plan. Which SAP Activate tool would you use?
SAP Analytics Cloud
SAP Fiori
SAP Solution Manager
SAP Roadmap Viewer
Which statements are part of the 5 Golden Rules for SAP S/4HANA Cloud, Single Tenant Edition?
There are 2 correct answers to this question.
Choose:
Use SAP Solution Manager 7.2 with Focused Build.
Stick to the security standards of the customer organization.
Document deviations from Golden Rules for transparency and future use in upgrades.
Foster a cloud mindset and adherence to the Fit-to-Standard approach.
What is the minimum number of Quality Gates mandated for SAP S/4HANA transition projects?
4
3
5
2
What do you do during Sprint Execution?
End a sprint when the sprint backlog items are all complete
Measure the sprint progress with a percentage complete report
Hold a retrospective at the end of each week
Present status of selected user stories in the sprint scope on a scrumboard
In SAP Activate, which workstream is responsible for ensuring that business processes are aligned with the SAP best practices?
Application Workstream
Data Management Workstream
Change Management Workstream
Technical Workstream
What is the purpose of the scrum board?
To visualize team progress
To show the functional breakdown of the solution scope
To document the results of integration testing
To manage the resource load
Which of the following are common Agile Project Planning artifacts?
There are 3 correct answers to this question.
Sprint Backlog
Increment
Burn-up Chart
Product Backlog
Gantt Chart
The client is not satisfied with the delivered product. What is the first step in Agile Project Delivery to address this?
Terminate the project and start a new one.
Conduct a retrospective to identify what went wrong.
Ignore the client's feedback as the project is already delivered.
Start a new sprint to fix the issues.
How can the project manager help to keep momentum in the project and help to keep the customer involved?
Walk through the solution processes with the stakeholders
Leverage agile cycles to build and test the solution
Add customer resources to the project to reduce the need for formal training
Increase the number of Q-Gates
In Which phase does the Transition to Operations work stream start?
Deploy
Realize
Explore
Prepare
In SAP Activate, what tool is used in the agile delivery approach during the Realize phase to make forecasts based on actual data?
Burndown Chart
Release Plan
Project Plan
Product Increment
How do you set up Scrum teams?
As a cross-functional team covering multiple functions, like configuration, data loads, and testing
Based on End-to-End Processes like Order-to-Cash
By type of work, like configuration Scrum, documentation Scrum, and testing Scrum.
Based on group size, but a minimum of 12 people
Which end-to-end turn-key Application Lifecycle Management (ALM) solution can support you in managing requirements and software development for large, Agile projects?
Solution Manager Test Suite
Focused Build
Requirement Management
Change Request Management
What is the purpose of a firm-up sprint?
To run end-to-end integration test
To perform String test
To demonstrate functionality from previous sprint
To revise a release plan and sprint plan
You have a critical dependency between two workstreams. How would you manage this?
Document the dependency and communicate it to both workstream leads.
Ignore it and hope it resolves itself.
Merge the two workstreams into one.
Delay one workstream until the other is complete.
Which of the following statements about Scrum is correct?
In Scrum, the team is Self-organized, define all task necessary for all project life cycle.
In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies.
The three ceremonies are sprint planning, daily scrum, sprint review (retrospective).
Scrum Master defines and prioritizes features and gathers requirements.
In SAP S/4HANA Cloud Public Edition, how are new features and updates typically introduced to the system?
Only upon customer request
Automatically on a quarterly basis
Annually during system maintenance
Through manual installation by the customer's IT team
Which of the following tools are specific to the Data Management work stream?
SAP Landscape Transformation
SAP Data Services
SAP S/4HANA Migration Cockpit (for both SAP S/4HANA Cloud and SAP S/4HANA editions)
Which of the following building blocks are part of the SAP S/4HANA platform?
LOB Cloud Solution
SAP Fiori UX
SAP HANA in-memory database
What is the difference between the "New Implementation of SAP S/4HANA Cloud" and the "New Implementation of SAP S/4HANA" transition paths?
There are different roles in the Application Design and Configuration workstream.
Upgrades of SAP S 4HANA Cloud are managed by SAP,and upgrades of SAP S/4HANA are managed by the customer.
Different sets of work streams are used for these transition paths.
SAP S/4HANA uses the Implementation Guide (IMG) and the In-App Extensibility Option for configuration and development and SAP S/4HANA Cloud uses SSCUls and the Side-by-Side Extensibility Option.
What are key characteristics of the implementation approach in SAP Activate Methodology?
Fixed scope
Validate solution
Premium engagement ready
Start with SAP Best Practices
On-premise only
In Agile Project Delivery, what is the outcome at the end of each sprint?
A fully documented set of features
A potentially shippable product increment
A list of backlog items for the next sprint
Feedback for the development team only
Which of the following scenarios are enabled for the "Selective Data Transition" transition path with the SAP Landscape Transformation tool?
Consolidation through online data replication
Extraction of Business Units
Security Migration
System Upgrade
System Consolidation
One of your workstreams is consistently missing deadlines. What is your first course of action?
Escalate the issue to higher management.
Terminate the workstream.
Reassign the workstream lead.
Conduct a root cause analysis.
How are SAP Best Practices implemented for an SAP Business Suite On-Premise solution?
Activate and apply SAP Best Practices using the SAP Implementation Guide
Assemble and apply SAP Best Practices to the system
Activate and apply SAP Best Practices content with the self-service configuration UI
Apply SAP Best Practices with the Configure your Solution application
A company using SAP S/4HANA Cloud Public Edition wants to integrate a third-party application for advanced analytics. What's the recommended approach?
Wait for SAP to release a similar feature in the next update
Use SAP Cloud Platform for integration without modifying the core system
Modify the core system to integrate the application
Migrate to an on-premise solution for integration capabilities
In which phase do you execute the User Acceptance Test?
Final Preparation
Build and Test
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise?
For the cloud edition, there is an additional Q-Gate for integration with on-premise systems
For on-premise, there is an additional Q-Gate for system installation
For the cloud edition, there is an additional work stream for integration with on-premise systems
For on-premise, there are additional deliverables for the system setup
Which tools does SAP Activate provide to support Guided Configuration?
Self Service Configuration
Expert Configuration
SAP Solution Composer
Solution Builder
Model Company
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner?
During the daily SCRUM meeting
During user acceptance testing
During the sprint review
During the sprint retrospective
In Agile Project Planning, who is primarily responsible for prioritizing the product backlog?
Product Owner
Scrum Master
Development Team
Stakeholders
Which accelerator can help you document the detailed design of solution extensions?
Product Backlog Template
RICEF Specification Template
Change Request Template
Sprint Backlog Template
Which accelerators support the Fit-to-standard workshop in the Explore phase?
Quality Gate Checklist
Business-Driven Configuration Questionnaire
Backlog template
Test Strategy
What is the key difference between Notes and Requirements in the Change and Deploy capability of SAP Cloud ALM?
Users can create a follow-up task that is actionable for Notes.
Notes are created from tasks.
Requirements are created from tasks.
Users can create a follow-up task that is actionable for Requirements.
You need to customize the SAP solution to meet specific business requirements. Which component of SAP Activate would you refer to?
Methodology
Agile Framework
Guided Configuration
Best Practices
What is the most granular level of the methodology you can view in the SAP Roadmap Viewer?
Deliverables
Scenario
Phase
Task
A company is undergoing a System Conversion to SAP S/4HANA. They want to ensure minimal business disruption during the transition. What strategy would you recommend?
Migrate data without any validation
Plan a comprehensive cutover strategy with thorough testing
Avoid any testing and move directly to production
Conduct the conversion during peak business hours
Which of the following tools within SAP Activate can assist in the rapid deployment of SAP S/4HANA Cloud Public Edition?
SAP Fiori Launchpad
SAP Best Practices Explorer
How would you describe the Explore phase in the "New Implementation of SAP S/4HANA Cloud" transition path?
Setup and Enablement
Simplification and Custom Code Impact Analysis
Solution Validation and Delta Design
Fit-to-standard
Your SAP project team is using Agile Project Delivery. The client is frequently changing requirements, leading to scope changes. How should this be managed in Agile?
Accept all changes without any review
Incorporate changes into the product backlog and prioritize them
Pause the project until the client finalizes requirements
Reject all changes to maintain the original scope
In the context of SAP S/4HANA On-Premise, what is the primary advantage of using the SAP Activate methodology?
It offers a combination of best practices, tools, and guided configuration
It provides a strict waterfall approach for implementations
It focuses only on cloud-based solutions
It replaces the need for any third-party tools
What is a benefit of using Guided Configuration instead of the Implementation Guide?
It ensures configuration is done using SAP Solution Manager
It eliminates the need to generate transport requests for configuration settings
It eliminates the need for Content Lifecycle Management
It ensures SAP updates do NOT conflict with customer configurations
Which content is made available after you activate SAP Best Practices for a new financial implementation?
Pre-configured business processes
Implementation Guide
Online help
Standard chart of accounts
In the SAP Activate methodology, which phase primarily deals with the migration of data and cutover activities?
Which SAP Activate phase focuses on validating the solution to ensure it meets business requirements?
You are in the 'Realize' phase of the SAP Activate methodology for an On-Premise implementation. What is your primary focus?
Data migration
System testing
System configuration
User training
Your team is falling behind the planned schedule. What Agile metric would be most useful to identify bottlenecks?
Velocity
Sprint Review
Lead Time
Which activity helps the Project Team add User Stories to the Product Backlog?
Preparing a Project Schedule
Assessing Project Risks
Planning the User Acceptance Test
Conducting the Solution Validation workshop
Which of the following are essential elements of a user story in Agile?
Title
Description
Developer's name
Estimation
Acceptance Criteria
Which of the following is true about a cloud implementation project?
The entire transport system is kept intact and up and running.
Starter Systems are not required to be in place for the 'Fit to Standard' workshops.
In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement.
The Starter System is specific to SAP S/4HANA Cloud.
What Sprint types are part of the SAP Activate Methodology?
Foundational
Firm-up
Daily
Initial
Build
Which phase of SAP Activate focuses on exploring the solution capabilities and adopting standard processes?
Which of the following content best outlines the sequence of testing within the Application Design and Configuration work stream in the Realize phase?
i. Integration Test
ii. User Acceptance Test
iii. String test
i. Data Migration
ii. String test
iii. User Acceptance Test
i. String test
iii. Integration Test
ii. Integration Test
What is the focus of a SCRUM of SCRUMS in an Agile context?
Integration topics
Backlog management
Communication to the Project Management Office
Best Practice adoption
Your team is working on an SAP project using Agile methodologies. During the sprint review, the client suggests significant changes to a feature that was demonstrated. How should the team handle this feedback?
Ignore the feedback since the sprint is already completed
Cancel the current sprint and start over
Make the changes immediately without any further discussion
Add the changes to the product backlog for consideration in future sprints
An organization has multiple SAP systems due to mergers and acquisitions. They want to transition to a single instance of SAP S/4HANA. Which approach allows them to consolidate their systems during the transition?
Selective Data Transition with consolidation capabilities
System Conversion with third-party tools only
Direct System Conversion
New Implementation without data consolidation
You are facing resource constraints. How should you prioritize the features in the product backlog?
Response:
Based on stakeholder requests.
Based on the complexity of the features.
Based on business value and impact.
Based on the development team's convenience.
An organization is considering SAP S/4HANA Cloud Public Edition for its global operations. They have a mix of standard and unique business processes. How should they approach their unique processes in this context?
Avoid the cloud edition and only consider on-premise solutions
Adopt standard SAP processes wherever possible
Customize the core system extensively to fit unique processes
Conduct a "Fit-to-Standard" analysis to identify gaps
Use the SAP Cloud Platform for extensions and integrations
What are some of the values of SAP Cloud ALM for implementation?
NO additional cost of product
Central cost and effort management
Accelerated time to market
Pre-loaded SAP Activate tasks
Comprehensive document repository
Which of the following are levels in the structure of an SAP Best Practices Solution Package?
Building Blocks
Configuration Guides
Scope Items
Business Process Scenarios
How are the build and test tasks planned and executed in the Realize phase?
By using the sprint backlog list as input for each iteration.
By executing regression tests after each iteration
By using incremental build in fixed-scope iteration
With Q-Gates for sign off after each iteration
What is SCRUM of SCRUMS?
Mechanism for gathering and validating requirements
Alternative to regular SCRUM process for smaller teams
Frequent inspection of code and configuration prior to quality gates
Integration meeting between the various project teams
What is the primary objective of the SAP Activate methodology?
To focus only on the technical aspects of SAP projects
To offer a flexible and agile method for SAP implementations
To provide a strict, phase-based approach to SAP projects
To replace all other SAP methodologies
In which SAP Activate methodology phase does the team complete the Transformation Strategy?
What tool do you use to configure an SAP Business Suite on-premise solution?
SAP Implementation Guide
ABAP Workbench
Configuration Composer
When does the Scrum Team receive formal confirmation that the User Stories are completed to the satisfaction of the Product Owner?
During the User Acceptance Test
During the daily Scrum meeting
During the Sprint Retrospective
During the Sprint Review
Which tool can you use to collaborate with other SAP Activate methodology practitioners?
Roadmap Viewer
SAP Implementation Assistant
SAP Jam
Which of the following best describes the concept of "Continuous Integration" in Agile Project Delivery?
Merging all feature branches at the end of each sprint
Integrating the project team with the client's team
Frequently integrating and testing code changes
Integrating only at the end of the project
How can SRCUM teams be organized?
By project phase
By job title
By work stream
By project governance level
Which of the following is a key characteristic of the Agile project approach?
Frequent quality gates
Iterative build with frequent inspections
Frequent and detailed project scheduling
Formal and detailed documentation
Which artifacts in the Testing work stream are created within the Realize phase for the New Implementation of SAP S/4HANA Cloud" transition path?
User Acceptance Test – Plan
Reporting Functional Specifications
Functional Specifications
Functional Test Scenarios
When implementing SAP S/4HANA Cloud Public Edition, which of the following is a primary advantage?
One-time purchase without recurring subscription fees
Complete customization flexibility similar to on-premise solutions
Rapid deployment with quarterly updates and innovations
Direct database access for custom development
Which of the following are the benefits of SAP JAM?
User collaboration
Reduced Recovery Time
Easy to use
Highly available
Where can you find Data Migration templates?
SAP S/4HANA Migration Cockpit
SAP Cloud Appliance Library
Why is there NO Sandbox system in the "New Implementation of SAP S/4HANA Cloud, Single Tenant Edition" transition path?
Because SAP S/4HANA Cloud, Single Tenant Edition, contains predefined business processes which should NOT be changed
Because the customer may use the SAP Model Company
Because the Fit-to-Standard workshop is conducted using the Q-system
Because the project team uses the DEV system to confirm solution fit and define delta requirements
Which of the following SAP S/4HANA Landscape Transformation options are enabled?
Migration of Selected Applications
Migration of Business Units
What is SAP Activate?
A bundle of ASAP, SAP Launch, and Rapid Deployment Solutions
A step-by-step instruction on how to remove from SAP best practices to your custom solution
A methodology for each of the deployment modes (cloud, on-premise, hybrid)
A combination of SAP best practices, methodology, and guided configuration
What is a key advantage of a private cloud over a public cloud in an SAP implementation?
Lower cost
Greater scalability
Enhanced security
Faster deployment
Which of the following is a key consideration when planning an SAP S/4HANA On-Premise implementation?
Planning for extensive customization without restrictions
Relying solely on cloud infrastructure
Ensuring automatic updates are enabled
Assessing hardware and infrastructure requirements
What is the order of artifacts within the Technical Architecture and Infrastructure workstream in the Prepare phase?
Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Technical Strategy
Hardware specification from Hardware Vendor -> Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results
Technical strategy -> Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results
Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Hardware Specification from Hardware Vendor
Which new role is introduced in the SAP Activate Methodology in a Full Scrum Team?
Application Consultant
Project Manager
System Administrator
What are some of the key topics covered in the Customer Team Enablement workstream?
Technical Expertise
Project Sourcing Approach
Planning skills
Project Management
Solution Expertise
A company requires extensive customization and integration with third-party applications in their SAP S/4HANA transition. Which cloud option would be most suitable for their needs?
Neither, as cloud solutions do not support customization
Both offer the same customization capabilities
Which criterion does the Product Owner use to sequence the product backlog?
Complexity
Relative effort
Resource availability
Business priority
Who determines the tasks that are required to complete the committed backlog items in a sprint?
SCRUM Master
Project Team
What does SAP Activate recommend to keep team members informed and aligned?
Daily progress review meeting with sponsor
Daily e-mail status updates to project manager
Daily status meeting with project manager
Daily team stand-up meeting
A company is using an older version of SAP ERP and is considering a move to SAP S/4HANA. They have significant custom code and modifications. What approach would you recommend for their transition?
New Implementation
System Conversion with custom code remediation
Selective Data Transition only for master data
System Conversion with complete custom code migration
Your team has just completed a sprint but not all features were developed. What should you do with the incomplete features?
Re-evaluate their priority and decide accordingly.
Remove them from the product backlog.
Move them to the next sprint.
Ask the team to work overtime to complete them.
Which of the following statements about Agile Project Planning is true?
Only the Scrum Master can suggest changes to the product backlog
Stakeholder feedback is continuously incorporated
Changes are discouraged during the project lifecycle
Documentation is not important in Agile
What do you do during post cutover?
Perform the Verification Session of the SAP Going Live Check
Setup Operational Support
Conduct Organizational Readiness Check
Perform Technical System Test
Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop.
Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps
Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps
Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios
Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps
Which artifacts are part of the Solution Adoption work stream?
System Go live Announcement (order)
Business Transformation Review (Point of View)
Project Business Case
Detailed Design - Business Process
In which phase should you first run the SAP Readiness Check for SAP S/4HANA in a "Selective Data Transition" transition path, in a System Consolidation scenario that includes conversion from SAP ERP?
Discover
What is the primary role of a Scrum Master in Agile Project Delivery?
Writing code and testing features
Facilitating the Scrum process and removing obstacles for the team
Prioritizing the product backlog
Making decisions about the product features
Identify the two landscape transformation specific tasks in the explore phase.
Define the Data Migration Architecture
Setup Landscape Transformation Software
Run a Landscape Transformation Assessment
Perform Client transfer
Which of the following can be used to navigate through the roadmap?
Tasks
Phases
Workstreams
What is the primary goal of a sprint retrospective in Agile Project Planning?
To plan the tasks for the next sprint
To review the completed tasks of the current sprint
To discuss and identify improvements for the next sprint
To introduce new team members
Which of the following are available in the initial SAP Methodologies JAM Page?
Roadmaps
Task description
Accelerators
Summary
What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition?
Solution validation
End-to-End walkthrough
Readiness check
Which of the following is NOT a key component of Agile Project Planning?
Sprint Planning
Waterfall Model
User Stories
Which of the following is not correct about workstreams?
It is assigned as an attribute to phases, deliverables and tasks
It can span phases
It is a collection of related deliverables
Workstreams are dependent on phase start and end
Which of the following are key aspects of business process monitoring?
Process change analysis
Root cause analysis
Automated problem resolution
Process mining reports
Predefined KPIs with process content
Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition?
End-to-End Integration Test
User Acceptance Test
Technical System Test
Unit Test
Which of the following is NOT a consideration when choosing between a private and public cloud?
Internet speed
Customization needs
Data volume
Regulatory compliance
As an SAP Activate Project Manager, you're in the "Realize" phase of the project. The client raises concerns about some gaps in the standard solution. How should you address these concerns using SAP Activate principles?
Revert to the "Prepare" phase to reassess the project scope
Insist on customizing the solution to meet all client needs
Skip the concerns and move to the next phase
Explore workarounds and adopt standard solutions wherever possible
Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content?
Navigate by Project Team Member Role
Navigate by assigned Delivery Mode
Navigate by RACI matrix accountability
Navigate by work stream
Which of the following ceremonies is NOT part of Agile Project Delivery using Scrum?
Product Backlog Grooming
Daily Stand-up
Monthly Budget Review
What capabilities does SAP API Business Hub provide to help you select integration options for your project?
Recommendations on using integration bus (SAP Process Orchestration or SAP Integration Suite)
Sandbox for testing APIs
Pre-packaged integrations
Integration with Ide and code generation
Advice on selecting scope items in SAP Best Practices Explorer
What term is used for a Ready-to-run SAP S/4HANA system with pre-built Solution Documentation, which supports End-to-End Processes for a specific industry so that the Project Team can focus on differentiation and innovation?
Best Practice System
Fully Activated Appliance
SAP Model Company
Which of the following is a Key Deliverable of the Prepare phase?
Change Impact Analysis and Communication Plan
Baseline Build
Solution Scope and Value Determination
Release and Sprint Plan
An organization has specific compliance and security requirements. They need an SAP S/4HANA Cloud solution that can be tailored to meet these needs while still benefiting from cloud capabilities. Which edition should they opt for?
Both editions offer the same compliance and security customization
Neither edition can be tailored for specific compliance needs
When considering a transition to SAP S/4HANA Cloud, what is the primary difference between the Private and Public Cloud editions?
The Private Cloud offers more customization capabilities compared to the Public Cloud
The Private Cloud is subscription-based, while the Public Cloud requires a one-time purchase
The Public Cloud supports third-party integrations, while the Private Cloud does not
The Public Cloud is hosted on the customer's infrastructure, while the Private Cloud is hosted by SAP
You are planning a system conversion. What is the most critical factor to consider?
Stakeholder approval
Cost of conversion
Speed of conversion
Data integrity
What is the primary consideration when choosing SAP S/4HANA Cloud Public Edition?
Budget constraints
Data security
Speed of implementation
Which tool within SAP Activate would you use for risk management?
SAP Risk Management
How often will an upgrade be performed on an SAP S/4HANA Cloud, Single Tenant Edition environment?
Schedule is defined by Service Level Agreement for SAP HANA Enterprise Cloud and SAP S/4HA NA Cloud, Single Tenant Edition Services
Every quarter
One upgrade and two feature packs per year
Every year
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition?
Custom code adjustment
Delta configuration
Development system migration
Operations impact analysis
Sandbox system migration
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate?
Project Documentation
Knowledge transfer to end users
Project Charter
Learning plan
When do you perform User Acceptance Testing during the Agile Build?
Before Integration Testing
During each Firm-up Sprint
After each Sprint
After Integration Testing
During an SAP project, you notice resistance from end-users regarding the adoption of new processes. Which workstream should be actively involved to address this challenge?
Project Management Workstream
SAP now offers the ability to deploy and manage solutions in which of the following environments?
On-premise
Cloud and On-premise
Cloud, On-premise and Hybrid
Cloud
In which tools can the project team across the SAP Activate Methodology content including accelerators?
SAP Community Network
SAP Service Marketplace
What is a Strategy Level 0 (LO) artifact?
Optional information that is NOT important for project activities
Preliminary strategy developed by the customer to approach the project in a specific work stream
Approach document that is developed by a united Project Team (partner + customer)
Project result that is developed solely by the partner
Which workstream in SAP Activate would be primarily concerned with user training and communication?
In Agile Project Planning, what is the primary purpose of a burn-down chart?
To track the number of defects
To display the team's velocity
To show the project budget
To visualize the amount of work remaining over time
What are the three pillars of SAP Activate?
SAP Best Practices
SAP Activate Methodology
SAP S/4HANA in-memory database
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation?
Deliverable
Scope Item
You are an SAP Activate Project Manager and notice that one of the features in the product backlog has unclear requirements. What is the best course of action?
Proceed with the current information and make assumptions
Seek clarification from the Product Owner or stakeholders
Remove the feature from the product backlog
Assign the feature to a senior developer for interpretation
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition.
What is the correct sequence of selected key deliverables across the project phases?
a. Code adjustment
b. Detailed System Assessment
c. Production Readiness Check
d. Validation of Migration
a. Production Readiness Check
b. Detailed system Assessment
c. Code Adjustment
a. Detailed system Assessment
b. Code Adjustment
c. Validation of Migration
d. Production Readiness Check
b. Production Readiness Check
Which of the following are part of the 10 SAP Quality Principles?
Plan one phase at a time.
Start scoping early.
Achieve production readiness.
Use standard functionality optionally.
You are in the deployment phase. What is the key focus during this stage?
Configuration
In which SAP Activate methodology phase does the team complete the Integration Validation?
Which of the following are benefits of using Ready-to-use Content?
Predictable results
Run SAP Like a Factory
Fast Time-to-Value
Minimized Total Cost of Ownership
You are planning to scale your Agile project. Which of the following frameworks would you consider?
SAFe
Lean
Kanban
Scrum
In the context of SAP Activate, which workstream ensures that the project stays within the defined scope, time, and budget?
What does the Side-by-Side Extensibility Option mean?
Transfer reporting to BW/4HANA
Context-aware SAP S/4HANA extensions, focused on tight integration
Extensibility based on the SAP Cloud Platform and published APls
Have two SAP S/4HANA instances - one for standard code, and another for custom developments
What accelerator can help you document the Configuration Definition in the Explore phase?
Change Request template
Data Definition
In which phase do you verify that the SAP Best Practices content meets the customer's business needs, and then capture gaps?
Which of the following is a key consideration for data migration in an On-Premise implementation?
User access levels
Cloud storage
You are managing multiple workstreams in an SAP Activate project. How would you ensure that they are aligned and coordinated?
Let each workstream operate independently.
Assign a separate project manager for each workstream.
Use a centralized project management tool for tracking.
Conduct daily stand-up meetings with workstream leads.
Which of the following is NOT a typical responsibility of the Change Management Workstream in SAP Activate?
Communication planning
Stakeholder management
Which of the following is NOT a component of SAP Activate?
Which of the following workstreams in SAP Activate primarily focuses on system installation, configuration, and integration?
Which of the following best describes the SAP S/4HANA On-Premise edition?
A solution hosted on the customer's infrastructure with more control over updates and customizations
A purely subscription-based model with limited customization
A solution that doesn't support integration with other SAP products
A cloud-based solution with automatic updates
An organization is planning a System Conversion to SAP S/4HANA. They have several legacy systems and want to consolidate their data during the transition. Which approach would best suit their needs?
Selective Data Transition with data consolidation
New Implementation without data migration
System Conversion with third-party data migration tools
Direct System Conversion without data consolidation
You are defining the testing strategy for your project What would you include in a Scope of Integration test?
The network communication
The functionality of modular processes
The functionality of end-to-end business processes
The connectivity between database and application servers
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration?
To create delta building blocks for complementary content
To activate the Best Practices content
To personalize activated, ready-to run business processes
To create customer-specific scope items
Which of the following tasks are required in the Prepare Phase?
Define the communication plan
Train the project team
Set up the infrastructure to support the project
Approve the test strategy
Identify relevant SAP Best Practices
An organization wants to leverage pre-configured content, business processes, and configuration guides for their SAP S/4HANA implementation. Which tool within SAP Activate should they utilize?
What are the responsibilities of the Product Owner in release and sprint planning?
Prioritize backlog user stories by business priority.
Estimate the backlog user stories.
Analyze the functional and technical dependencies between the user stories.
Define objectives for each release.
You are using selective data transition. How would you ensure data integrity?
By manually checking each data entry.
By conducting thorough testing post-transition.
By relying on automated tools for data migration.
By taking stakeholder approval for data transition.
An organization is transitioning from a legacy ERP system to SAP S/4HANA Cloud Public Edition. They want to ensure a smooth data migration process. Which of the following should they prioritize?
Purchasing additional storage for data backup
Customizing the new system to match the legacy system exactly
Training users on the old system for data entry
Cleansing and preparing data for migration
When considering a System Conversion to SAP S/4HANA, which of the following is a critical preparatory step?
Migrating all data without any cleansing
Customizing the new system before migration
Decommissioning the old system immediately
Performing a thorough system and custom code analysis
During a sprint, a critical bug is found in a feature delivered in the previous sprint. How should this be handled in Agile Project Delivery?
Ignore the bug since it's from a previous sprint
Address the bug immediately if it's a high priority
Wait for the client to report the bug
Add the bug to the product backlog
Discuss the bug in the next sprint retrospective
Which of the following are benefits of Agile Project Planning?
Please select all the correct answers that apply.
Fixed project scope
Flexibility to adapt to changes
Enhanced collaboration among team members
Reduced project risk
Faster time to market
Which pre-loaded content is available in SAP Cloud ALM for implementation?
Software configurations
Business process best practice content
Activate methodology tasks
Roles and authorizations
What are two important approaches, based on the Control Center concept that SAP proposes to use for streamlined implementation and operations within Premium Engagements?
Always Connected
Build SAP Like a Factory
Intelligent Enterprise
Which of the following best describes the update frequency for SAP S/4HANA Private Cloud?
There are no updates; the system remains static post-deployment
Updates are mandatory and occur daily
Updates are optional and can be scheduled based on the organization's preference
Updates are identical in frequency and content to the Public Cloud edition
In which phase should you create a Data Migration Strategy (LO) during a Selective Data Transition?
You are tasked with implementing SAP S/4HANA Cloud Public Edition. What is the first step you should take?
Configure the system settings.
Purchase the required licenses.
Conduct a fit-gap analysis.
Start data migration.
How does the provisioning of SAP S/4HANA Cloud differ from the setup of SAP S/4HANA?
To start a Solution Validation workshop, a DEV system is available for SAP S/4HANA, while a Starter system is required for Fit-to-standard for SAP S/4HANA Cloud.
SAP S/4HANA systems take less time to provision than SAP S/4HANA Cloud systems.
There is a Preset phase for 0-system, which is unique for SAP S/4HANA Cloud.
In SAP S/4HANA Cloud, decommissioning/shutdown of the Starter system is initiated automatically after the P-system is requested through the Manage Your Solution app, whereas in an SAP S/4HANA system, the DEV system persists.
According to the Definition of Done, which activity must be completed for each sprint?
The Solution must be built and configured in the development system (DEV)
End user training must be delivered
Functionality must be tested in the Quality system (QAS)
Functionality must be released to the business
What technique helps a Scrum Team to prioritize a large, flat Backlog?
Retrospective
Planning Poker
User Story Mapping
Fit/Gap Analysis
An organization has chosen SAP S/4HANA On-Premise due to its customization needs. However, they are concerned about future upgrades. How can they ensure that upgrades are smoother despite customizations?
Upgrade the system only once every few years
Rely on third-party tools for customizations
Ensure customizations are done outside the core system, preferably using SAP Cloud Platform
Avoid any customizations and only use standard features
Which of the following will help you avoid modification of standard functionality in SAP S/4HANA Cloud, Single Tenant Edit on?
The Side-by-Side Extensibility Option (such as SAP Cloud Platform)
A developer key
The 5 Golden Rules
Contract restrictions in SAP HANA Enterprise Cloud and SAP S/4HANA Cloud, Single Tenant Edition
SAP Code Inspector
The hyper care period is part of which phase?
Go-Live
Which estimation technique can be used in an Agile delivery approach to size the User Stories during sprint planning?
Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks
Detailed bottom-up effort estimates by the Scrum Master in story points based on the User Story complexity
Product Owner’s relative estimate of the effort that will be needed to implement the user story
Relative estimate in ideal person days that reflects the best estimate provided by the project team
You are considering a transition to a public cloud. What should be your primary concern?
Scalability
Speed of deployment
Cost-effectiveness
How do you achieve frequent checkpoints with the end user in an Agile delivery approach?
Solution Demo for Sprints
Demo the SAP Model Company
Solution Review for Waves
In SAP Activate, which tool provides a centralized place for project documentation, testing, and business process management?
What can users do in the Roadmap Viewer tool?
Download full SAP Activate methodology content for use off-line
Upload SAP Activate WBS into SAP Solution Manager7.1
Create a customer-specific version of SAP Activate Methodology
Display and navigate detailed SAP Activate methodology WBS
How many deliverables are a part of the Key Deliverable 'Project Initiation'?
One
Four
Three
Two
What are the three elements of SAP Activate?
Content
Tools
As an SAP Activate Project Manager, you notice that the development team is consistently failing to deliver all the committed backlog items in a sprint. What should be your immediate action?
Extend the sprint duration
Review and adjust the team's velocity for future sprints
Reduce the team's size
Ask the team to work overtime to meet the commitments
In what respect is SAP Activate Methodology different from the ASAP Methodology?
Supports cloud deployments
Includes Fit/Gap analysis instead of Blueprint
Supports only new implementations
Leverages iterative incremental build
In the context of SAP S/4HANA Cloud Public Edition, what is the primary role of the "Fit-to-Standard" analysis?
Ensuring that the company's IT infrastructure is compatible with SAP S/4HANA
Customizing the solution to fit the company's unique processes
Identifying gaps between standard SAP solutions and business requirements
Training end-users on standard SAP processes
Where can you find the Integration Content?
SAP API Business Hub
Cloud Integration Automation Service
SAP Cloud Appliance library
How can a customer get access to SAP Cloud ALM?
SAP Cloud ALM can be bought on the SAP Store.
SAP Cloud ALM fair usage rights are included in SAP MA Attention and SAP Active Attention at NO additional cost.
SAP Cloud ALM fair usage rights are included in SAP Enterprise Support, cloud editions at NO additional cost.
SAP Cloud ALM fair usage rights are included in SAP Preferred Success and SAP Preferred Care at NO additional cost.
An organization is keen on a cloud solution for SAP S/4HANA but wants to ensure data residency within their country due to regulatory requirements. Which cloud option should they consider?
SAP S/4HANA Public Cloud, as it is hosted globally
Neither cloud option can guarantee data residency in a specific location
SAP S/4HANA Private Cloud, as it offers dedicated instances with data residency options
Both cloud options ensure data residency within the customer's country
What tool provides sizing estimations for the "System Conversion" transition path?
SAP Transformation Navigator
Scope and Effort Analyzer
SAP Readiness Check
What are the benefits of the SAP best practices?
Fast time to value
Simple on-boarding to cloud
Fixed organizational structure
Reduced functional scope
What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition?
Rapid prototyping
Project team training
Full project SCRUM
What can you do in the SAP Roadmap Viewer tool?
Create a customer-specific version of a roadmap.
Navigate detailed Solution Implementation Roadmaps.
Download full roadmap content for offline navigation.
Comment on Deliverables and Tasks within Roadmaps.
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations?
Value Audits
Production Support Plan
Value Determination
Change Management Plan
Scope Validation
Which tool within SAP Activate provides guided configuration with a reference solution?
Which of the following tools are used for rapid database migration?
Software Update Manager (SUM)
Database Migration Option (DMO)
SWPM (software provisioning manager)
Which key deliverable includes the development of RICEFW objects?
Development Build
Enhancement Delivery
Sprint Execution
Custom Extensions Management
Working in an Agile approach, what should your planning look like at the beginning of the Realize phase?
Go-Live scope is fixed on the first of January the following year.
Timelines of the Sprint may differ due to the workload.
Project scope and planning are completed and final.
User Stories are in a Ready state for NO more than the first three Sprints.
Which of the following is not a characteristic that the quality principles are based on?
Experience of Typical Pitfalls
SAP Quality Award example winners
International standard
Which of the following are examples of Ready-to-run SAP S/4HANA systems?
SAP Mission ControlCenter
What tool provides guidance on replacing custom code developed for SAP ERP with SAP S/4HANA functionality for the "System Conversion" transition path?
Software Update Manager with Database Migration Option
Simplification Item Check (SI-Check)
Software Provisioning Manager
In SAP S/4HANA On-Premise implementations, which tool can assist in monitoring and managing the system landscape?
SAP Cloud Platform
SAP Landscape Management
Which new project roles are introduced with the SAP Activate methodology for the Agile delivery approach, compared to waterfall?
Integration Lead
Design Thinking Coach
What are deliverables of the Application: Integration work stream in the prepare phase?
Data Cleansing
Security Checks
Adaptation Specifications
Network Connectivity Checks
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition?
Start with executable content
Limited involvement of business stakeholders
Waterfall approach
Design-based
What is the purpose of the Solution Validation activity in the Explore phase?
To verify technical installation
To identify gaps
To log additional scope items
To challenge changes to standard
To educate project participants
Which of the following tools can assist in analyzing custom code compatibility when planning a System Conversion to SAP S/4HANA?
What is the purpose of the SAP Activate Methodology?
To enable access to the SAP ecosystem
To accelerate the initial implementation of SAP S/4HANA
To provide end-to-end integrated application lifecycle management
To manage project and solution documentation
Which key activities does the Guided Configuration support you with?
Manage roles of configuration users
Train new users
Create test data
Test configured processes
View solution scope
Which component of SAP Activate offers customers a reference solution in the cloud for a quick start?
In SAP Activate, what replaces the detailed Blueprint from ASAP?
Business Process Mapping
Custom Extension management
Fit/Gap Workshops
Which of the following best describes the SAP Activate methodology?
A strict waterfall approach to SAP implementations
A combination of best practices, methodology, and guided configuration
A tool for project documentation and testing
A user interface tool for SAP applications
A large manufacturing company with complex business processes and legacy systems is considering SAP S/4HANA. They want maximum flexibility in terms of customization and integration. Which edition would you recommend?
SAP S/4HANA Cloud Public Edition
SAP S/4HANA Cloud Private Edition
SAP S/4HANA On-Premise
SAP S/4HANA Cloud Essentials Edition
Which collaboration features can SAP Activate Jam users access?
Ask questions
Update Key Deliverable wikis
Tweet questions
Comment on documents
How would you describe the Realize phase in the "New Implementation of SAP S/4HANA" transition path?
Configure and adjust custom code
Configure
Configuration copy
Configure and develop
Which of the following content best outlines the scope of the Integration Test?
a. Prototype
b. Delta/gap solutions
c. Data flows with non-SAP application
b. Delta configuration
c. Data flows between SAP solutions
a. Solution baseline
Which activities are part of the Design and Configuration application of the SAP Activate methodology?
Perform Fit/Gap Analysis
Schedule kick-off workshop
Conduct Scope Validation
Confirm Integration prerequisites
How do you gain access to the SAP Activate Methodology Jam site?
Register on SAP Service Marketplace
Send e-mail to SAP contact address
Submit e-mail address via on-line form
Join SAP S/4HANA group on SAP Community Network
An organization is implementing SAP S/4HANA. They want to ensure that their master data is cleansed, transformed, and loaded efficiently into the new system.
Which workstream in SAP Activate should be responsible for this activity?
Which of the following are included in ready-to-use content in SAP Activate?
Business models from leading companies in each industry sector
Project accelerators
Courses delivered by SAP Education
What is the difference between the "System Conversion and the "New Implementation of SAP S/4HANA" transition paths?
There are different upgrade cycles.
In the Realize phase, custom code is adjusted rather than developed for System Conversion.
SSCUls are used in System Conversion for configuring SAP S/4HANA through the Manage Your Solution app.
In the Realize phase, data is converted and NOT migrated for System Conversion.
Ready-to-use Content in SAP Activate includes which of the following?
Project Accelerators
Which of the following belong to the Application Design and Configuration work stream for SAP S/4HANA Cloud in the Explore phase?
Kick-off workshop
Configuration definition
Fit-to-standard workshop
Integration prerequisites confirmation
What is the main advantage of choosing an On-Premise implementation over a Cloud implementation?
Greater customization
Easier maintenance
What are some of the key characteristics of the implementation approach in SAP Activate Methodology?
Based on Ready-to-use Content
Cloud Ready
On premise only
Delta-based
In the System conversion to SAP S/4HANA Deploy phase, which of the following tasks are included?
Hyper care support
Interface setup
Final testing
Scheduling project plan
Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase?
a. Conduct Solution Validation workshops
b. Set reference value
c. Prioritize initial backlog
d. Conduct Delta Design workshops
a. Set reference value
b. Prioritize initial backlog
c. Conduct Delta Design workshops
d. Conduct Solution Validation workshops
b. Conduct Delta Design workshops
c. Set reference value
d. Prioritize initial backlog
b. Conduct Solution Validation workshops
Who determines the priority of user stories in the backlog of an Agile project?
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation?
Adjusting custom code objects
Implementing best practices
Creating transactional data
Organizational structure
Changing master data
You have decided to go for a hybrid cloud model. What is the most complex challenge you are likely to face?
Data integration between private and public clouds
Cost management
Which of the following are not phases of the SAP Activate methodology?
Preparation
Go-Live & Support
You are facing resistance from internal stakeholders for an On-Premise implementation. What should be your first step?
Proceed with the implementation without their approval.
Conduct a cost-benefit analysis to present to the stakeholders.
Cancel the project.
In the context of transitioning to SAP S/4HANA, what is the primary advantage of the "Selective Data Transition" approach?
It allows for a complete overhaul and re-implementation of the system
It provides a direct upgrade path without any data migration
It offers flexibility in choosing which data and processes to migrate
It ensures that all customizations are automatically retained
During a system conversion, you encounter data inconsistencies. What should be your immediate action?
Continue with the conversion and fix inconsistencies later.
Roll back the conversion.
Pause the conversion and resolve the inconsistencies.
Ignore the inconsistencies as they are minor.
You are managing an SAP project using the Activate methodology. During a project review, a stakeholder inquires about the tasks related to data migration. Which workstream would you refer to for detailed activities and responsibilities?
The tasks associated with Landscape transportation are in which workstream?
System & Data Migration
Transition to Operations
Technical Architecture and Infrastructure
Application Solution Adoption
Which deliverable is specific to on-premise and NOT for the cloud?
Technical Design Solution
Knowledge Transfer
Adaptation Specification
Learning Needs Analysis
Which of the following tools is used to install SAP S/4HANA?
SWPM (Software Provisioning Manager)
Cloud Application Library
Data Migration server
In the context of SAP S/4HANA On-Premise, which of the following provides a guided approach with tools, best practices, and processes for implementation?
SAP Activate
In the context of SAP Activate, what is the primary purpose of workstreams?
To define the technical architecture of the solution
To segregate tasks based on their priority
To organize and structure tasks and activities across different areas of focus
To document the project's financial details
What is the key characteristic of Agile project delivery?
Frequent Quality Gates
In Agile Project Delivery, who is responsible for quality assurance and testing of the features developed in a sprint?
Only the QA team
Only the developers
The entire Scrum team, including developers and QA
The Scrum Master
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase?
Solution Validation Workshop
A company is transitioning to SAP S/4HANA Cloud Public Edition. They are concerned about the frequency of updates and how it might disrupt their operations. How should you address their concern?
Inform them that updates are optional and can be skipped
Explain that updates are designed to be non-disruptive with thorough testing before release
Suggest they switch to an on-premise solution to avoid frequent updates
Recommend that they hire additional IT staff to manage updates
What does a cutover involve?
Closing quality gate
Transport ng new product increment in the development system
Presenting completed User Story to key users
Switching productive business operations from one system to another
In the SAP S/4HANA Cloud landscape, which edition is typically best suited for organizations looking for a turnkey solution with minimal customization?
Both editions are equally suited for turnkey solutions
Neither edition offers a turnkey solution
An organization has opted for SAP S/4HANA On-Premise. They are concerned about the potential challenges of data migration from their legacy systems. How should you address their concern?
Inform them that data migration is automatic and requires no effort
Suggest they start from scratch without migrating old data
Explain the tools and best practices available for data migration in SAP Activate
Recommend outsourcing the data migration process to a third party
Which activities are critical for delivering Agile projects?
Retrospective agenda creation
Sprint planning
Release planning
Blueprint scheduling
Which content packages are available in the SAP Package Library?
Rapid Deployment Solutions
What are the core capabilities in SAP Cloud ALM for operations?
Upgrade analysis
Operation automation
Monitoring
Event and alert management
License management
In which of the following project phases is it important to plan and schedule data loads followed by load validation activities?
Which phase of SAP Activate focuses on moving the solution from a test environment to a live production environment?
Which of the following is a potential challenge when performing a System Conversion to SAP S/4HANA?
The inability to migrate custom code
The automatic deletion of all master data
The need to remediate or adapt custom code and configurations
The mandatory use of cloud infrastructure
When transitioning to SAP S/4HANA, what does the term "System Conversion" primarily refer to?
Migrating from a non-SAP system to SAP S/4HANA
Upgrading from an older SAP ERP version to SAP S/4HANA
Transitioning from SAP S/4HANA Cloud to On-Premise
Implementing a new module within an existing SAP S/4HANA system
What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud?
Implementation portal for SAP S/4HANA Cloud
SAP Support Marketplace
An SAP project is in its final stages, and there's a need to validate the system's performance under load. Which workstream should take the lead in this activity?
Where can you find Project Library Accelerators?
You are in the final stages of project delivery and a stakeholder requests a non-critical feature. What should you do?
Add the feature to the current sprint.
Politely decline and focus on completing the project.
Add the feature to the product backlog for future consideration.
Immediately implement the feature without consulting the team.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase?
Design for the Gaps and Deltas
Data Migration Approach
Validation Workshops
What Solution Operations Framework can customers use to create a joint Business and IT organization, that will secure transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems?
Customer Center of Expertise
SAP Operations Control Center
Business Transformation Management Methodology
What do you do during an iterative approach to build a solution?
Build the solution module by module
Deliver a prototype of the solution
Provide a working solution only at the end of the release
Include frequent inspection check-points
Which of the following are components of SAP Model Company?
Preconfigured Solution
Business Process Content for SAP Solution Manager
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology?
SAP Hybris
SAP S/4HANA Cloud Edition
SAP S/4HANA On-Premise Edition
Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition
What are some core objectives of business process monitoring?
To provide transparency over end-to-end processes
To increase business process execution quality
To provide process update and change feedback
To provide reverse business process analysis
In which phase will the customer develop a preliminary strategy for building a target Operations and Support organizational model?
Prepare phase
Run phase
Explore phase
Discover phase
In a Selective Data Transition approach to SAP S/4HANA, which of the following activities is typically involved?
Migrating all data without any selection criteria
Choosing specific processes, data, and configurations for migration
Completely avoiding any data migration
Relying solely on automatic data migration tools
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal?
An organization is keen on understanding the phases, deliverables, and tasks associated with their SAP implementation. Which tool in SAP Activate would you recommend they refer to?
You are an SAP Activate Project Manager and you have just received a change request that will impact the project scope. What should you do first?
Implement the change immediately.
Reject the change request.
Evaluate the impact on the project timeline and budget.
Inform the stakeholders about the change.
What tool is used to synchronize changes between SAP ERP and SAP S/4HANA maintenance tracks?
SAP Code Vulnerability Analyzer
Business Process Change Analyzer
Retrofit
Which of the following is a key advantage of the SAP S/4HANA Private Cloud edition over the Public Cloud edition?
Reduced costs due to shared infrastructure
Automatic mandatory updates without any control
Greater flexibility in terms of customization and configuration
Limited integration capabilities with other SAP products
What activities do you perform during the fit-to-standard workshops milestone in the SAP Activate methodology within SAP Cloud ALM?
Create SAP Fiori screen mock-ups in SAP Cloud ALM.
View details of high-level process flows in SAP Cloud ALM.
Create notes and/or requirements in SAP Cloud ALM.
Create wireframes for user interfaces in SAP Cloud ALM.
View details of business process diagrams and descriptions in SAP Cloud ALM.
Which of the following statements about SAP S/4HANA Cloud Public Edition is true?
It allows deep customization and modification of the core system
It is hosted and maintained by the customer's IT team
It provides regular updates with new features and capabilities
It is a one-time purchase without any subscription model
What are the responsibilities of the Project Team on level 4 in the picture below?
Set Project policy, standards and oversight
Set business priorities, goals and objectives
Identify and resolve issues and risks
Perform status reporting and communication
What is the correct order of the SAP Activate Methodology phases?
Plan -> Design -> Build -> Operate
Discover -> Prepare -> Explore -> Realize -> Deploy -> Run
Plan -> Build -> Run -> Sustain
Prepare -> Discover -> Explore -> Realize -> Deploy -> Run
Which of the following is NOT a typical step in selective data transition?
Data mapping
Data cleansing
Data encryption
Data validation
In which phase of the SAP Activate methodology does the team complete the Transformation Planning?
You are asked to provide a detailed project plan. Which SAP Activate tool would you use?
Your organization is transitioning from a traditional SAP implementation approach to using SAP Activate. What key benefits can you expect from this shift?
Faster time to value
Reduced flexibility in project execution
Guided configuration
A rigid, waterfall approach
Best practices and methodologies for SAP projects
What information does the project team need before they can correctly estimate the relative size of backlog user stories?
Available project resources
Test strategy
Definition of Done
Overall project schedule
Which of the following are key principles of Agile Project Delivery?
Embracing change
Delivering frequently
Extensive documentation
Collaboration between business and developers
Following a strict plan without deviations
What does the Content element of SAP Activate provide?
Functional Specifications for WRICEF development
End-User guides
Business Processes Content
Migration Content
Integration Content
Which of the following is NOT a typical workstream in an SAP Activate project?
Application Development
Data Migration
Marketing and Sales
Infrastructure
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition?
Solution Activation
Optimize software Change Control Management
Training delivery
Access organizational and production readiness
What term is used for workshops that are intended to assess SAP Standard functionality against customer requirements and collect delta requirements during the "New Implementation of SAP S/4HANA" transition path?
Solution Validation
Design Thinking
Delta Design
Fit-to-Standard
A company is implementing SAP S/4HANA On-Premise and wants to ensure that they utilize best practices for their industry. Which tool within SAP Activate can guide them?
Which of the following are the pillars of SAP Activate?
SAP Launch Methodology
SAP ASAP Methodology
What is the objective of a sprint retrospective meeting?
Define the stakeholder management approach
Review and prioritize the backlog
Provide formal feedback to the project manager
Improve the SCRUM process
Via which media does SAP provide Ready-to-run systems for SAP S/4HANA deployments?
Blu-ray disks
SAP Solution Builder tool
SAP App Center
Which of the following statements about SAP S/4HANA Public Cloud is true?
It allows deep customization similar to on-premise solutions
It provides automatic updates and innovations on a regular basis
It is hosted on the customer's infrastructure
It supports unlimited third-party integrations without restrictions
In the context of SAP S/4HANA Cloud, which edition provides a balance between standardization and flexibility, allowing for some level of customization and configuration?
Both editions offer the same level of flexibility
Neither edition allows any customization
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise?
Key Deliverable
Work Stream
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project?
What are some of the values of SAP Cloud ALM for operations?
It provides end-to-end transparency.
It provides a solution readiness check.
It provides improved efficiency and automation.
It provides license management capabilities.
It provides reduced cost of operations.
Which of the following is NOT a benefit of implementing SAP S/4HANA Cloud Public Edition?
Quick deployment
High customization
Lower TCO (Total Cost of Ownership)
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition?
Custom code Adjustment planning
Data aging configuration
Non-production systems migration
Value determination
What is the primary purpose of the SAP Activate Methodology?
To manage solution documentation
To provide the sequence of actions in the project
To provide end-to-end Application Lifecycle Management
What are the core capabilities in SAP Cloud ALM for implementation?
Portfolio management
Custom code management
Test management
Task management
Process management
Which of the following is NOT a characteristic of SAP S/4HANA Cloud Public Edition?
Pre-configured content
Regular mandatory updates
Deep customization capabilities
Subscription-based pricing
What is the basis for approving work results (signing Act of Acceptance) on a Project Phase level?
Agreed and met Acceptance Criteria within Quality Gate
Definition of Done for User Story
Definition of Ready for Sprint
Scrum of Scrums meeting decision
In which phase do you create an ordered list of everything that is known to be needed in the product"?
You are new to SAP Activate. What is the first phase you should focus on?
Which Value Chains does SAP Solution Manager 7.2 deliver?
Detect-to-Correct
Request-to-Fulfill
Hire-to-Retire
Requirements-to-Deploy
Cash-to-Order
In which phase do you create a prioritized list of user requirements?
In the "New Implementation of SAP S/4HANA" transition path, which systems are part of the project system landscape?
DEV
P-system
Starter system
QAS
What solution operations framework can customers use to create a joint business and IT organization?
SAP Roadmap Explorer
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer?
In which phase do you run the user acceptance test?
Which of the following tasks are part of the Production support after the Go Live key deliverable?
Resolve issues identified during the Hyper Care period
Provide further training to customer end users
Set up the Operations Control Center
Perform a Technical systems test
In which phase of the SAP Activate Methodology does the team complete the System Assessment?
Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud' transition path?
Which artifacts are created within Application Design and Configuration work stream in the Explore phase of the "New Implementation of SAP S/4HANA" transition path?
Delta Requirements List - Register
Roles and Authorizations Management Concept
Project Procedure - Mock-up Modeling
Organization Structure Specification