Which of the following statements are true for Scrum of Scrums meetings? (3 Correct)
1.) They do not need to be time boxed to 15 minutes.
2.) They allow teams to discuss their work, focusing especially on areas of overlap and
integration.
3.) They are problem-solving meetings
4.) They need to be held daily.
During which phase of a new implementation of SAP S/4HANA on Premise is the Development
system installed and technically configured, as well as Scope Items activated based on results
form Fit-Gap workshops?
1.) Explore
2.) Realize
3.) Prepare
4.) Deploy
5.) Discover
The duration of a Building Sprint should be between 2 and 4 weeks
1.) TRUE
2.) FALSE
Which of these are Workstreams of the SAP Activate Methodology? (4 Correct)
1.) Development
2.) Customer Team Enablement
3.) Testing
4.) Project Management
5.) Migration
6.) Design and Configuration
During a new implementation of SAP S/4HANA on Premise sizing exercises are important to
estimate hardware budget.
1.) FALSE
2.) TRUE
The SAP Solution Implementation Methodology includes a sequence of actions based on
methodological elements, PMBOK content, and open-source tools.
In a new implementation of S/4HANA Cloud Multi-Tenant Edition during the Realize phase
the Starter System shutdown is automatically initiated after requesting a P-System.
What is a correct statement for the product owner?
1.) The product owner is the project customer, and defines the requirements and priorities of
the project.
2.) The product owner has the authority to to terminate any development sprint in cases
where non resolvable issues arise or the workload proves to be inadequate.
3.) The product owner is responsible for making sure that everyone follow the Scrum rules.
4.) The product owner is the team leader, who is responsible for moderating meetings,
producing documentation, and resolving any isssues during the project.
What are outputs of the SAP Transformation Navigator? (3 Correct)
1.) Transformation Guide
2.) Software Guide
3.) Extension Guide
4.) Implementation Guide
5.) Technical Guide
6.) Business Guide
The Sprint Review meetings purpose is to continously improve the Scrum process using lessens
learned from the sprint execution.
In the System conversion to SAP S/4HANA Deploy phase, which of the following tasks are
included?
1.) Scheduling project plan
2.) Interface setup
3.) Final Testing
4.) Hyper Care support
Via which media does SAP provide Ready-to-run system for SAP S/4HANA deployment? (2
Correct)
1.) Blu-ray disks
2.) SAP App Center
3.) SAP Cloud Appliance Library
4.) SAP Solution Builder tool
Which end to end turn-key Application Lifecycle Management (ALM) solution can support you
in managing requirements and software development for large, Agile projects?
1.) Focused Build
2.) Solution Manager Test Suite
3.) Change Request Management
4.) Requirement Management
What is an Epic in the product backlog?
1.) A description of desired functionality told from the perspective of the user or customer.
2.) A large user story, typically a process or Scenario
3.) A collection of related user stories
Which of these are SAP Solution Manager 7.2 Value Chains? (4 Correct)
1.) Invoice to Pay
2.) Detect to correct
3.) Request to Fulfill
4.) Requirement to Deploy
5.) Order to Cash
6.) Portfolio to Project
Which Artifacts belong to the Requirement to Deploy value chain of SAP Solution Manager
7.2? (2 Correct)
1.) Work Package
2.) Project
3.) Test Case
4.) Service Request
5.) Incident
What's the Release cycle of S/4HANA Cloud Single-Tenant Edition?
1.) 2 Releases in 3 years
2.) Bi-Yearly Releases
3.) Quarterly Releases
4.) Monthly Releases
5.) Yearly Releases
What is the correct order of project lifecycle steps for a new implementation of S/4HANA Cloud
Multi-Tenant Edition?
1.) 1. Experience Trial 2. Setup and Enablement 3. Solution Validation and Delta Design 4.
Configure, develop 5. Migrate, Integrate, Extend, Test 5. Onboard and Deploy 6. Operate,
Monitor, Support
2.) 1. Setup and Enablement 2. Experience Trial 3. Fit-to-Standard 4. Configure 5. Migrate,
Integrate, Extend, Test 5. Onboard and Deploy 6. Operate, Monitor, Support
3.) 1. Experience Trial 2. Setup and Enablement 3. Fit-to-Standard 4. Configure 5. Migrate,
What’s the deciding factor for priorisation?
1.) Business Value
2.) Resource Availability
3.) Development Effort
4.) Time Effort
When does the Scrum Team receive formal confirmation that the User Stories are completed to
the satisfaction of the Product Owner?
1.) During the Sprint Review
2.) During the Sprint Retrospective
3.) During the User Acceptance Test
4.) During the daily Scrum meeting
Which of the following regarding elements of the SAP Activate Implementation Framework is
true? (2 Correct)
1.) Tools are part of a project infrastructure. They provide the team with an interface to
access and manage information (migrate data, interact with global SAP Communities, access
ready-to-use content, configure the SAP S/4HANA system, and so on).
2.) The SAP Solution Implementation Methodology combines: - Core and supporting
methodological elements - A sequence of actions based on methodological elements, SAP
content, and SAP Tools - Foundation for Quality Assurance services - Foundation for SAP
Associate Project Manager certification
3.) Regarding the content SAP Best Practices provide projects with a full configuration and
Ready-to-run systems provide projects with a productive system.
What are available target solutions for the transition path Selective Data Transition? (2 Correct)
1.) SAP S/4HANA On Premise
2.) SAP S/4HANA Cloud Single-Tenant Edition
3.) SAP S/4HANA Cloud Multi-Tenant Edition
For On Premise deployments SAP provides Ready-to-run systems on the following media: (2
1.) Through Dropbox
2.) Through SAP Cloud Appliance Library
3.) Blu-ray Disks
4.) USB-Drive
5.) Floppy Disk
In a new implementation of S/4HANA Cloud Multi-Tenant Edition the Q-System includes
configuration and master data for selected cloud solutions for targeted enablement of the project
team on SAP standard processes and to be the host environment of the Fit-to- Standard
Workshops
What is the first step in writing a user story?
1.) Answering the question of how.
2.) Answering the question of what.
3.) Answering the question of who.
What are key measures of the Data Volume Management? (4 Correct)
1.) Data Deletion
2.) Data Cleansing
3.) Data Avoidance
4.) Data Archiving
5.) Data Summarization
New backlog items can be added to the sprint during the execution of the sprint.
What are major accelerators for the Integration Workstream in the Realize Phase?
1.) Interface register template
2.) Interface Functional Specification Template
3.) Technical Specification - Enhancements Template
4.) Interface Documentation in SAP Solution Manager 7.2
What's used to customize / configure during a new implementation of S/4HANA Cloud
Single-Tenant Edition?
1.) IMG
2.) SSCUI's
What is the difference between the “New implementation of SAP S/4HANA Cloud” and the “New
Implementation of SAP S/4HANA” transition path? Note: There are 2 correct answers to this
question. (2 Correct)
1.) Different sets of workstream are used for these transition paths.
2.) There are different roles in the Application Design and Configuration workstream.
3.) Upgrade of SAP S/4HANA Cloud are managed by SAP, and upgrades of SAP S/4HANA are
managed by the customer.
4.) SAP S/4HANA uses the implementation Guide(IMG) and the in-App Extensibility Option for
configuration and development, and SAP S/4HANA Cloud uses SSCUIs and the Side-by- Side
Extensibility Option.
What tool is used for the SAP Activate Transition Path Selective Data Transition?
1.) Software Update Manager
2.) SAP S/4HANA Migration Cockpit
3.) SAP Landscape Transformation
What is the correct description for the Prepare Phase?
1.) During the Prepare phase the project team will use an agile approach to iteratively and
incrementally build the functionality from the backlog. This build follows the prioritization
given by the product owner that continues to be involved with the project during the sprints.
2.) In the Prepare phase, we define project governance, start teh project, define/identify the
resources, define the roles and responsibilities for the project team, and detail the management
plans for running the project.
3.) In the Prepare phase, we run the Fit/Gap analysis on the working system with the best
practices content up and running. The objective of the Prepare phase is to identify the fit of the
best practices based solution, capture delta configuration requirements, identify gaps, and
configuration values. All these are captured by the project team in the backlog and later, in
Realize phase the backlog items are implemented in the system. The best practices content is
used as a jump-start for the project.
Solution Validation and Delta Design Workshops are part of a new implementation of S/4HANA
Cloud Multi-Tenant Edition
How do you achieve frequent checkpoint with the End User in an Agile Delivery Approach? (2
1.) Demo the Model Company
2.) Solution Review for Waves
3.) Solution Demo for Sprints
4.) User Acceptance Test
The Fit-to-Standard and Solution Definiton Workshop are part of the Prepare Phase
What is the product backlog NOT? (3 Correct)
1.) Design documentation
2.) List of activities how to transform requirements into product
3.) Dynamic prioritized requirements list
4.) Requirements specification with loads of details
What are Scrum Master Tasks during Project Preparation? (3 Correct)
1.) Ensures development environment is available
2.) Ensures project set-up is done correctly and completely
3.) Ensures management or others do not influence team for sprint / project work
4.) Ensures team enters remaining effort daily
5.) Ensures rough architecture and high-level requirements are available
Product Backlog is simply a list of all all things that needs to be done within the project. It replaces
the traditional requirements specification artifacts.
What's true regarding the characteristics of S/4HANA Cloud Single-Tenant Edition? (4 Correct)
1.) On Premise Edition Scope
2.) Full support for On Premise integration scenarios?
3.) Full IMG configuration possibilities
4.) Modifications of SAP Standard Coding is available
5.) Full SAP S/4HANA extension possibilities
Which of the following tools are specific to the Data Management Workstream? (3 Correct)
1.) SAP Data Services
2.) SAP Landscape Transformation
3.) SAP S/4HANA Migration Cockpit ( for both SAP S/4HANA Cloud and SAP S/4HANA edition)
4.) SAP Solution Manager
5.) SAP Roadmap Viewer
In a new implementation of S/4HANA Cloud Multi-Tenant Edition during the Explore phase
which kind of workshops is conducted?
1.) Fit Gap Workshop
2.) Fit-to-Standard Workshop
What are the responsibilities of the Product Owner in Release and Sprint Planning? (2 Correct)
1.) Analyze the functional and technical dependencies between User Stories
2.) Eliminate the backlog User Stories
3.) Prioritize backlog User Stories by business priority
4.) Define objective for each Release
Which of the following are part of the 10 SAP Quality Principals? (2 Correct)
1.) Start scoping early
2.) Achieve production readiness
3.) Plan one phase at a time
4.) Use standard functionality optionally
What is part of the SAP Activate Project Library content for SAP S/4HANA? (2 Correct)
1.) Ready-to-run systems
2.) Project Plan
3.) SAP Best Practices
4.) Accelerators
5.) System Content
6.) Guidance
What are the supported approaches for SAP Landscape Transformation? (3 Correct)
1.) System consolidation
2.) Selected Business Unit migration
3.) Selected Applications migration
4.) Hardware migration
What are IT responsibilities during Release Planning? (2 Correct)
1.) Prioritize Product Backlog
2.) Estimate Product Backlog
3.) Analysis of Technical Dependencies
4.) Define Product Backlog
What does the Content element of SAP Activate provide? (3 Correct)
1.) End-User guides
2.) Integration Content
3.) Business Processes Content
4.) Migration Content
5.) Functional Specification for WRICEF development
What are main categories in regards to security tasks and responsibilities? (4 Correct)
1.) Secure Setup
2.) Secure Code
3.) Secure Operation
4.) System Architecture
5.) Security Compliance
Which of these are SAP Project Roles of the Implementation Partner in the Project Management
Workstream? (4 Correct)
1.) Quality Manager
2.) Project Manager
3.) Development Lead
4.) Project Administrator
5.) Project Sponsor
The recommended landscape for a new implementation of SAP S/4HANA On Premise is three
tiered (DEV, QAS, PRD)
The Daily Stand-up Meeting purpose is to solve problems.
The goal of the firm-up sprint is to ensure integration of the Product Increments delivered within
previous Build Sprints
In a system conversion Simplification Item Checks (SI-Check) are based on Simplification Item
Catalog provided through SAP Support Portal. Custom Code analsyis tools in SAP Netweaver 7.5
compare custom code in SAP ERP with Simplification Catalog Items and provide guidance on
custom code adoption, technical and functional implications and check consistency of
configuration and data.
Which of the following are Analytics and Reporting options? (4 Correct)
1.) SAP IDM
2.) SAP GRC
3.) SAP ACR
4.) Digital Boardoom
5.) SAP S/4HANA Embedded Analytics
6.) SAP BW/4HANA
Sprint Execution is the period during which the task-level work is performed by the development
team to complete the features committed to during sprint planning.
What's the recommended choice for On Premise-to-On Premise Integrations scenarios?
1.) SAP Process Orchestration
2.) SAP Cloud Platform Integration
Which test confirms that new functionalit is not causing defects in existing functionality?
1.) Unit Test
2.) Integration Test
3.) User Acceptance Test
4.) Regression Test
5.) String Test
What are correct statements regarding the Transition Path Selective Data Transition? (2 Correct)
1.) Migrate a selection of data
2.) Avoid full redesign SAP ERP processes and reuse SAP ERP processes, but rather re-use some parts and redesign some other parts
3.) Reengineering and process simplification based on latest innovations
4.) Performing initial data load
5.) Implementing innovative business processes with pre-configured content on a new
platform
The backlog represents the list of requirements that have not been built during the baseline
build but need to be delivered to business. The Scrum team will prioritize the list once it ist
completed. It is important to capture all requirements before focusing on prioritization.
SSCUI's provide customers with access to SAP S/4HANA On Premise configuration.
What is the most granular level of the methodology you can view in SAP Roadmap Viewer?
1.) Deliverables
2.) Task
3.) Scenario
4.) Phase
Which kinds of extensibility are available on-premise? (2 Correct)
1.) Managed Extensibility
2.) Classic Extensibility
3.) Key User Extensibility
In which step during the selective data transitioning is the transformation assessment happening?
1.) Prepare
3.) Deploy
4.) Discover
5.) Explore
Which of the following are SAP DevOps Tools? (3 Correct)
1.) Jira
2.) CSOL
3.) ChaRM
4.) TDMS
5.) SAP Code Inspector
In which phase are the most important activities in the Customer Team Enablement Workstream
performed?
1.) Deploy
3.) Explore
5.) Prepare
6.) Run
What’s the Scrum of Scrums?
1.) Problem Solving Meeting
2.) Integration Meeting
3.) Planning Meeting
4.) Review Meeting
Who decides on the content of a sprint?
1.) Scrum Master
3.) Scrum Team
4.) Product Owner
What are the benefits of the Ready-to-use Content? (3 Correct)
1.) Simple on-boarding to cloud
2.) Predictable results
3.) Fixed organizational structure
4.) Reduced functional scope
5.) Fast time to value
ALM Processes and tools shall be implemented as part of the Project Infrastructure before which
phase?
1.) Run
5.) Deploy
6.) Prepare
Ready to use Content in SAP Activate includes which of the following? (2 Correct)
1.) SAP Best Practices
2.) Project Accelerators
3.) Courses delivered by SAP Education
4.) Business models from leading companies in each industry sector
SAP Solution Manager Focused Build is a powerful solution for Service Providers and larger
customers who want to manage all their systems in a central, scalable, and automated
environment.
What are the responsibilities and tasks of the Scrum Master? (4 Correct)
1.) Though leadershop in technical excellence of delivery of the functionality
2.) Accepts or rejects work results.
3.) Act as a guide in helping the team to adhere to Scrum principles and practices
4.) Protects the team from bureaucracy and non-value added activities
5.) Help team develop and adopt practices facilitating agile project execution
What are substreams of the Solution Adoption Workstream? (3 Correct)
1.) Value Management
2.) Quality Assurance
3.) Organization Change Management
4.) End User Training
5.) Project Management Office
What is the purpose of the Solution Validation activity on the Explore phase? (3 Correct)
1.) Challenges changes to standard
2.) Identify gaps
3.) Verify technical installation
4.) Log additional scope items
5.) Educate project participants.
Which of these are content provisioning tools? (5 Correct)
1.) openSAP
2.) KPI Catalog
3.) SAP Best Practice Explorer
4.) SAP Fiori App Reference Library
5.) SAP Solution Manager
6.) SAP Roadmap Viewer
For solutions with limited in-App extensibility Solution Validation (Workshop A) is named
Fit-to-Standard Workshop and Delta Design (Workshop B) is called Solution Definition.
During the Discover phase of a new implementation of SAP S/4HANA on Premise to Customer
Team shall be trained in business Processes, which are part of the pre-configured solution
selected for Fit-Gap Analysis.
What are approaches for System Conversion to SAP S/4HANA? (3 Correct)
1.) Near-Zero Downtime Technology (NZDT) approach for further reduction of downtime
based on a consulting service project
2.) Downtime-optimized conversion approach using SUM and reduced downtime by moving
data conversion partly to uptime
3.) Standard approach using Software Update Manager (SUM) with several optimizations
Which workstreams are part of the SAP Activate Methodology? (5 Correct)
1.) Data Management
3.) Extensibility
4.) Solution Adoption
5.) Workers Council
Which of the following are levels in the structure of an SAP Best Practices Solution
Package? (2 Correct)
1.) Business Process Scenarios
2.) Scope Items
3.) Configuration Guides
4.) Building Blocks