NO.1 During the upgrade of your development system, you run into the adjustment of nondictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
A. SUM continues with the next phase and your modifications are kept as In the start release
B. SUM continues with the next phase and your modifications are lost
C. Before continuing with the next phase SUM asks for a modification adjustment transport
D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
NO.2 You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
A. SWPM using the Backup / Restore procedure
B. SUM with DMO
C. SUM without DMO
D. SWPM using the Load procedure
NO.3 How does SUM recognize modification adjustment transports from predecessor systems?
A. By searching for transport requests that are assigned to the project SAP_ADJUST
B. By searching for transport requests named <SID>K0<number>
C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
D. By searching for transport requests in the file umodauto.Ist
NO.4 You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
A. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
C. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
NO.5 In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2
correct answers to this question.
A. When performing an SAP S/4HANA conversion with DMO
B. When performing an SAP S/4HANA conversion without u DMO
C. When upgrading an SAP S/4HANA Server system
D. When upgrading an SAP ECC system with DMO
NO.6 You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
A. Specify the business functions that need to be switched on during the prepare part of SUM.
B. Import a transport request from the development system that contains the recording of the
activation.
C. Activate the required business functions manually in the production system.
D. During conversion, SUM delivers some business functions already activated.
NO.7 You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
A. After SUM has ended
B. During the Execution roadmap step
C. Before the start of the SUM technical downtime
D. During the SUM technical downtime
NO.8 What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question
A. You can verify that the content of the download directory matches the stack XML file.
B. You can obtain migration duration tiles from a previous benchmark run that can be used to
optimize the next runs
C. You can record the modification adjustment during migration and use the transports in the next runs.
D. You can find the optimal number of parallel H3load processes by monitoring host performance
NO.9 You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
A. The SAP support packages that will be bound to the conversion
B. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
C. The SAP support packages of the support package stack, calculated by the maintenance planner
D. The SAP support packages in the download directory that are newer than the selected support package stack
NO.10 Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
A. Shadow on target creation
B. Downtime conversion
C. Silent data migration (SDM)
D. Downtime migration
NO.11 What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
A. Phases DIFF*
B. Phase DOWNCONF_DTTRANS
C. Phase RUN_RSPTBFIL _ISUTABU
D. Phases EU_IMPORT*
E. Phase RUN_RSDBSCPY
NO.12 During an SAP S/4HANA conversion with DMO, which of the following actions take place
during the business downtime of the SUM procedure?
A. Execution of SPAU modification adjustment
B. Execution of eCATTs for business validation tests
C. Creation of the table structures in the new SAP HANA database
D. Execution of SPDD modification adjustment
E. Execution of XPRAs and AIMs
NO.13 What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
A. Standalone AS ABAP with SAP_BASIS 752 and above
B. SAP Solution Manager 7.2
C. SAP S/4HANA Server 1809 and above
D. SAP ECC system from SAP ERP 6.0 EHP 8
NO.14 During a SUM run, you want to check if the PARCONV_UPG phase is still running properly.
Where can you find information about this? Note: There are 2 correct answers to this question.
A. Check the running batch job via Job Overview (SM37).
B. Check for running R3trans processes on the host where SUM is running.
C. Check for running R3load processes on the host where SUM is running.
D. Check the latest log files in the SUM directory, subdirectory abap, subdirectory tmp.
NO.15 You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control
Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
A. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
B. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
NO.16 You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
A. EU_IMPORT_ALL
B. EU_CLONE_MIG_DT_CREATE
C. EU_CLONE_MIG_SOT_RUN
D. EU_CLONE_MIG_DT_RUN
NO.17 You have chosen the "Advanced" option during the main configuration of the SUM tool.
Which steps take place via the shadow instance?
A. Conversion of application tables (PARCONV_UPG)
B. Activation of dictionary objects (ACT_UPG)
C. Switch to new repository (EU_SWITCH)
D. Modification adjustment (SPDD)
NO.18 Which Guides contain information about SUM phases starting with "EU_CLONE_"?
A. The SAP S/HANA Conversion Guide
B. The Application Guide
C. The major SUM Guide
D. The DMO Guide
NO.19 You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime
Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
A. Upgrade the SAP system
B. Perform an SAP S/4 HANA conversion without DMO
C. Perform an SAP S/4 HANA conversion including DMO
D. Apply SAP support packages
E. Use DMO for SUM
NO.20 Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
A. Keep archiving on during the whole procedure.
B. Use the Near Zero Downtime Maintenance Technology (NZDM).
C. Reuse a profile for the shadow instance from a previous run.
D. Choose the instance number of the shadow instance.
NO.21 You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion.
What is the main difference from a standard SAP S/4HANA conversion?
A. An additional temporary database is used during uptime
B. Dedicated application tables are migrated in uptime
C. TABIMJJPG is executed in uptime
D. The repository is migrated in uptime
NO.22 What do you need to consider when performing the SI checks for an SAP S/4HANA
conversion? There are 2 correct answers to this question.
A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
D. You need to build up a SI check framework by applying SAP notes.
NO.23 You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
A. The source system is non-Unicode and the target database is a scale-out system.
B. The target database size increases temporarily because of the Shadow Repository.
C. SAP HANA Landscape Reorganization required a manual step to edit a file.
D. Network capacity between exporting and importing R3load processes must be.
E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31
NO.24 You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does
SUM transfer the data by default from the source database to the target database during the
migration?
A. Using R3load and network socket connection
B. Using R3load and memory pipes
C. Using R3load and file transfer
D. Using work processes and network socket connection
NO.25 You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode
Conversion (CU &UC) procedure.
NO.26 You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
A. Run the database migration to the SAP HANA database
B. Perform the migration of data into the new data structure
C. Check the compatibility of custom code with SAP S/4HANA
D. Apply the recommendations of the simplification list
NO.27 You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
A. AA
B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
NO.28 You are performing an SAP S/4HANA conversion with DMO. You are using the downtime- optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note:
A. Software update
B. Conversion
C. Main import
D. Migration
NO.29 In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
A. Upgrading to SAP ECC 6.08 without using DMO
B. Using DMO when applying Support Packages to SAP ECC 6.07
C. SAP S/4HANA conversion to SAP S/4HANA 1709
D. Updating to SAP ECC 6.07 using DMO
NO.30 What do you need to know about the SAP S/4HANA Conversion Guide?
Note: There are 2 correct answers to this question.
A. It explains the database migration option (DMO) of SUM.
B. It contains a section about the simplification item (SI) checks.
C. It explains where to find information about the custom code analysis.
D. It is a database-specific document.
NO.31 You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion?
Note: There are 3 correct answers to this question.
A. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
B. Unicode conversion SAP S/4HANA conversion including database migration
C. Unicode conversion SAP S/4HANA conversion without database migration Database migration
D. SAP S/4HANA conversion including database migration and Unicode conversion
E. Unicode conversion Database migration SAP S/4HANA conversion without database migration
NO.32 You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
A. PARMVNT_UPG
B. TABIMJJPG
C. PARDIST_SHD
D. TABIM_SHADOW_*
NO.33 Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
A. Create "modified* versions of the objects that you need to adjust
B. Release the transport request containing the modification adjustment
C. Assign the transport request as a modification adjustment transport
D. Manually activate the adjusted dictionary objects
NO.34 What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
A. To optimize the migration
B. To optimize the activation
C. To optimize the conversion
D. To optimize the main import
NO.35 During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
C. In the job log for the corresponding job in SM37 (Job Overview)
D. In the corresponding R3trans log files of this phase
NO.36 During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running
properly. Where can you find information about this?
A. Check for running batch jobs in the shadow system via Job Overview (SM37)
B. Check for running R3trans processes on the host of the primary application server
C. Check for running R31oad processes on the host of the primary application server
D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
NO.37 What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
B. SAP ECC system from SAP ERP 6.0 EHP 8
C. SAP Solution Manager 7.2
D. SAP S/4HANA Server 1809 and above
NO.38 You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
A. Apply the corresponding SAP note via SAP Note Assistant
B. Generate it by analyzing the specific custom code via RFC
C. Configure it within transaction ATC
D. Download it from SAP Support Portal
NO.39 During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
A. DMO with system move
B. Migration repetition option
C. Table count verification
D. Table contents compare
NO.40 During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
A. It performs a comparison on selected tables using check sum.
B. It performs a comparison on all tables using row counts.
C. It performs a comparison of all tables using check sum.
D. It does NOT perform any table comparison.
NO.41 What do you need to know about the SAP ERP Upgrade and Update Guide?
A. It contains a troubleshooting section
B. It is target release specific
C. It contains a section "free space requirements"
D. It is a database-specific document
NO.42 You are performing an SAP S/4HANA conversion of the development system. Which
credentials do you use in which system to perform the adjustment of programs and other nondictionary repository objects (SPAU)?
A. Credentials of a named user in client 000 of the shadow system
B. Credentials of a named user in the development client of the development system
C. Credentials of user DDIC in client 000 of the shadow system
D. Credentials of user DDIC in the development client of the development system
NO.43 Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
A. Target DB size will increase temporarily
B. A
C. DMO can only be run with systems NW740 or NW731
NO.44 What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
A. Extract the SAP HANA database installation archive
B. Move the stack.xml update file into the download folder
C. Extract the SAP HANA client installation archive
D. Move the SAPM update archive into the download folder
E. Move the R3trans update archive into the download folder
NO.45 You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
B. EU_CLONE_MIG_SOT_RUN
C. EU_CLONE_MIG_DT_RUN
D. EU_CLONE_MIG_DT_CREATE
NO.46 During a DMO procedure with SUM, after which phase is the repository first available on the target database?
A. Uptime migration (EU_CLONE_MIG_UT_RUN)
B. ParaUel distribution (PARDIST_SHD)
C. Downtime migration (EU_CLONE_MIG_DT_RUN)
D. Shadow repository creation (EU_IMPORT*)
NO.47 You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
A. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
B. Import of upgrade and language data from the download directory in phase TABIM UPG
C. Activation of dictionary objects in phase ACT_UPG
D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
E. Import of dictionary objects from the download directory in phase DDIC_UPG
NO.48 You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system.
You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
A. In SUM Phaselist
B. In Process Control Center
C. In SUM Parameters
D. In DMO Migration Preparation
NO.49 You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
A. Kernel for target release, Windows, SAP MaxDB
B. Kernel for target release, Linux, SAP HANA
C. Kernel for target release, Windows, SAP HANA
D. Kernel for source release, Windows, SAP MaxDB
NO.50 When using the DMO of SUM, which files can be handled by SUM in the download directory?
A. Parameter file SAPup_add.par
B. Stack XML file calculated by the Maintenance Planner
C. Breakpoint configuration file SAPUPPHAS.BRK
D. MIGRATE J5T_DUR_XML file from a previous run
NO.51 Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
A. Unicode conversion
B. Custom code analysis
C. Database migration
D. Software update
NO.52 ICNV initialization does 3
A. Creation of views
B. AA
C. Creation of flag
D. Build index on flag column
NO.53 Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
A. The link to different patch levels to SUM
C. The corrections to the SUM Guide
D. An overview about possible upgrade paths
NO.54 You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
A. The upgrade of the PRD must be finished before you start new development in the DEV.
B. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
C. The transport between Unicode and non-Unicode systems is forbidden.
D. The upgrade of the PRD must be finished before you import any transports from the upgrade DEV system into the PRD.
NO.55 What do you need to consider when performing the SI checks for an SAP S'4I 1ANA
conversion? Note There are 2 correct answers to this question.
A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
B. The SI checks are executed in the development system and the results are transported into the subsequent systems
C. The errors from the SI checks must be solved, otherwise. SUM will report an error
D. You need to build up an SI check framework by applying SAP Notes
NO.56 The SUM procedure stops with an error during uptime. How can you identify the current
phase, the one in which SUM encountered an error?
A. Check the most recent entries shown in file sapevt.trc
B. Check the system log (transaction SM21) of the SAP system
C. Check the messages shown by the SUM UI
D. Check the most recent entries in SAPup.log
NO.57 SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
A. The path was stored in file host_profile during registration
B. The path was stored to the environment of user <sid>adm during registration
C. The path is taken from the URL entered in the browser to start SUM
D. The path was stored in file sumabap conf during registration
NO.58 You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist? There are 2 correct answers to this question.
B. A Standalone SAP system with ABAP 7.51 or above
C. An SAP S4HANA 1709 sandbox system
NO.59 What is the benefit of using the file UPGANA.XML from a previous SUM run?
A. To auto-fill specific fields on selected screens on the SUM UI
B. To make the progress information within SUM UI more accurate
C. To repeat specific phases during the SUM run
D. To skip selected phases during the SUM run
NO.60 You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via
the shadow instance? Note: There are 2 correct answers to this question.
A. Modification adjustment (SPAU)
B. Modification adjustment (SPDD)
C. Activation of dictionary objects (ACT_UPG)
D. Conversion of application tables (PARCONV_UPG)
NO.61 You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized
Conversion (DoC) is NOT selectable.What could be the reason?
A. The SAP S/4HANA Conversion is without DMO.
B. The SAP S/4HANA Conversion includes a DMO.
C. The start release is too old for DOC.
D. The source database is not supported
NO.62 You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?
A. As part of the cleanup process
B. Before the downtime starts
C. Early in the downtime
D. At the end
NO.63 What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
A. An upgrade of the software components is performed, without changing the database type.
B. A change of the database type is performed, without changing the software components.
C. An SAP S/4HANA conversion is performed, without adapting the customer data.
D. A migration of the SAP system to a new hardware is performed, without performing an SAP
S/4HANA conversion.
NO.64 You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
A. The start of the Execution roadmap step
B. The start of the business downtime
C. The end of the business downtime
D. The end of the database migration
NO.65 Which circumstances will allow SUM to run without the creation of a shadow system?
A. Using the main configuration option "Single System" when installing an Add-On
B. Using the main configuration option "Single System" in case of an upgrade.
C. Using the database migration option (DMO) for SUM
D. Using the main configuration option "Standard" when applying SAP Support Packages
NO.66 You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
A. SYCM (Simplification Database Content)
B. SAT (Runtime Analysis)
C. ATC (ABAP Test Cockpit)
D. SE80 (Object Navigator)
NO.67 In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
A. During downtime
B. During SPDD
C. Post-downtime
D. During uptime
NO.68 You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?
A. Check the compatibility of custom code with SAP S/4HANA.
B. Run the database migration to the SAP HANA database.
C. Solve problems from the simplification item (SI) checks.
D. Perform the migration of data to the new data structure.
NO.69 Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
A. SAP S/4HANA conversion including DMO
B. Prerequisite check
C. DMO without system update
D. SAP S/4HANA conversion without DMO
E. Benchmark tool
NO.70 You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
NO.71 What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
A. 750
B. 700
C. 731
D. 740
NO.72 What is the different between the benchmaking and the repetition option of the Database
Migration Option (DMO) of SUM?
A. The benchmaking option allows you to migration a specified set of tables
B. The benchmaking option allows you to repeat the uptime migration
C. The repetition option allows you to run the migration without a shadow system
D. The repetition option allows you to repeat the complete migration
NO.73 Which preparational steps must be performed for an SAP S/4HANA conversion?
A. Uninstall industry extensions not supported by SAP S/4HANA
B. Install add-on SAP Gateway 7.50
C. Uninstall Fiori apps not released for SAP_UI 7.50
D. Delete client 066 (Early Watch Client)
NO.74 Which of the following are valid options to check the progress of an inplace SUM DMO run?
Note There are 2 correct answers to this question
A. Check the dump size of the database export on disk.
B. Check the Charts Control Center in the SUM Ul
C. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
D. Check the log files written in the SUM directory subdirectory abap. subdirectory log
NO.75 Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
A. Dual Stack split
B. Support Package Stack update
D. Release upgrade
E. Homogenous system copy
NO.76 You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
A. The SAP Support Packages that will be bound to the upgrade
B. The SAP Support Packages contained in the upgrade media
C. The SAP Support Packages found in the download directory
D. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
NO.77 You are executing a standard SUM procedure to update an SAP system using main
configuration mode "Standard". When will the shadow system be stopped for the last time?
A. Before the downtime starts
B. At the end of the downtime
C. As part of the cleanup process
D. Early in the downtime
NO.78 In ICNV. How database operations synchronized between the source and the target table?
A. Deletes are directly executed in the target table by delete trigger.
NO.79 Which are valid options to check the progress of the database migration in a Microsoft
Windows environment?
A. Check the "Charts Control Center" in the SUM UI
B. Check logs for jobs starting with "RSUPG_SGEN" in the system
C. Check the log files written under "SUM\abap\log"
D. Check the dump size of the database export on disk
NO.80 You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
A. These are 40 pairs of Reload processes, so there are 80 R3load processes running.
B. SUM is still running in uptime; the 40 defined Reload processes are considered.
C. Without table contents comparison, only 40 R3load processes are being started.
D. There are 40 Reload processes used for copying and 40 Reload processes for table count
verification.
NO.81 You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which
transaction needs to be executed to use that content in the ASU Toolbox?
A. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
B. /ASU/SSM (ASU Simple Schedule Manager)
C. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
D. /ASU/START (Start ASU Toolbox)
NO.82 Which downtime optimization technique requires the minimized downtime service (MDS)
from SAP?
A. Downtime Optimized DMO (DoDMO)
B. Near-Zero Downtime Maintenance (nZDM)
C. Near-Zero Downtime Technology (NZDT)
D. Downtime Optimized Data Conversion (DoC)
Zuletzt geändertvor 3 Tagen