Which of the following components belong to SAP S/4HANA?
Please choose the correct answer.
Response:
PP-DS
Demand planning
Inventory management
Response and supply planning
Question:
What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
System upgrade
Landscape transformation
System conversion
New implementation
System activation
What are some uses for the low-level code assigned to each material?
There are 2 correct answers to this question.
It is used in MRP to determine the sequence in which materials are planned.
It is used by product costing to determine how costs are rolled up.
It is used by ATP to determine the priority of alternative components.
It is used by engineering to identify sub items in an engineering bill of material (BOM).
).
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed?
Create and assign setup group/setup keys in the production data structure.
Create and assign a setup matrix with setup transition time to the resource
Create and assign a new graphical object for setup time in the planning board.
Run setup minimization heuristics or optimizer.
What generates capacity requirements in a process order?
Activities
Operations
Resources
Phases
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Selection Method
Contract
Production Version
Purchasing Info Record
Which of the following processes lead to an entry in the MRP planning file?
Change of the storage bin
Creation of a sales order
Creation of a purchasing contract
Creation of dependent requirements
Change of the material’s procurement type
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
Use the fixed lot size procedure.
Use the reorder point.
Use the minimum order quantity.
Use the MRP type for vendor managed inventory.
What statements are true concerning a plant?
A plant can belong to many company codes.
A plant/division combination can be assigned to only one business area.
Product costing can be performed across plants.
Several purchasing organizations can be assigned to a plant.
BOM information is also used in what other activities in an organization?
Sales orders
Material master maintenance
Reservations and goods issue
Product costing
Which functional capabilities does the Detailed Scheduling Board have?
Enter time-ticket confirmation for production orders
Change sales order quantities
Change planned order quantities
Undo for drag & Drop planning activities
Which of the following planning strategies are make-to-stock strategies?
Planning at assembly level
Production by lot size
Planning without final assembly
Planning with final assembly
Under what circumstances can you change the material type if stocks, reservations, or purchasing documents exist?
The same base unit of measurement is used
The quantity and values updates are the same
The same batch management level is used
The same account category is used
With reference to confirmations, which statements are correct?
With milestone confirmation, the preceding operations and suboperations will be confirmed until the next milestone operation.
The standard value key maintained in the work center determines whether an operation is relevant for confirmation or not.
For progressive confirmation, you can perform confirmation at the end of the day
By default, you can perform only partial confirmation while performing milestone confirmation.
Capacity requirements will be completely reduced when you perform final confirmation.
The end user is working on a production order but can't post GI for the order, encountering error message Current order status does not allow goods withdrawals. The user then tried to confirm the order and again encountered an error. The Order is not released.
What is the next course of action the user should take?
First, print the shop floor papers.
Delete the order because there are so many errors in it.
Try to post GR, and the error may be resolved.
First, release the order.
Which characteristics should a material have for re-order point planning?
Demand remains relatively constant.
Material replenishment is managed by the vendor (VMI).
Replenishment lead time is known and relatively constant.
Seasonal demand is relatively volatile
In net requirements planning of the MRP, which of the following are seen as requirements?
Stock
Fixed receipts
Safety stock
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potentials crap of the high-value material?
master of the assembly and set the net indicator in the routing operation where the component is used
Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.
Enter the component scrap in the material
Enter the operation scrap and set the net indicator in the component of the bill of mater al of the assembly.
Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.
Which of the following settings are contained in a product heuristic?
Scheduling strategy
Lot-sizing
Available-to-promise
Net requirements
Which statements are correct with reference to capacity leveling?
Dispatch of operations is the main function of capacity leveling.
Both tabular and graphic planning tables are part of future architecture of SAP S/4HANA.
One work center can't be occupied by several operations at the same time.
The drag and drop method can be used for dispatching in graphical planning.
The tabular capacity planning table provides period-oriented aggregated information for the available capacities.
What are key benefits of SAP S/4HANA MRP Live?
Real-time analysis of disruptions in the material flow
Simultaneous capacity planning by default
Runs on any device
Significantly higher data footprint leveraging SAP HANA
What are the advantages of the new MRP Live in SAP S/4HANA compared to the classic MRP from SAP ECC?
MRP Live reads and writes data in parallel threads.
MRP Live writes MRP lists during the run.
MRP Live optimizes multi-level make-to-order planning.
The MRP Live planning scope is more flexible.
What steps are possible in a PP/DS production planning run?
Detailed scheduling functions
Demand consumption
Heuristics
Optimization
Backorder processing
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
It links receipts from an alternative location in case of a shortage in the default location
It propagates changed sales order priorities to the pegged planned orders
It replaces fixed pegging relationships unless they have been created for stock
It enables the propagation of network alerts across the bill of materials structure
Which of the following belong to supply chain master data objects?
Product cost collector
Distribution center
Vendor
Account
Which unit of measure is the stock keeping unit?
Unit of issue
Base unit of measure
Sales unit
Order unit
Which of the following deployment option provides the latest innovations delivered quarterly?
SAP S/4HANA AnyPremise edition
SAP S/4HANA, hybrid edition
SAP S/4HANA Cloud, essentials edition
SAP S/4HANA Cloud, extended edition
With reference to archiving and deletion, which statements are correct?
The only restriction for setting the deletion indicator (DLT) is to have the order with DLFL.
Residence time 2 should have passed after setting the deletion indicator to archive the orders.
The prerequisite for setting the deletion flag is to have closed (CLSD) status.
Setting the deletion flag (DLFL) is the first step.
It's not possible to display the orders after they are archived and deleted.
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated?
The requirements date occurs that of a firmed planned receipt
The requirements date occurs before that of a firmed planned receipt
A firmed planned receipt cannot be rescheduled
The requirement no longer exists
You want to triggering-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
Planning without final assembly (50)
Make-to-order production (20)
Planning with final assembly (40)
Planning at assembly level (70)
The production order default storage location for components can be defined in which of the following master data objects?
Material master of components
Routing, in the component allocation
Location field maintained in the work center
BOM item details
How many variants can be created for a variant BOM?
Up to 1,000
99
Based on the number of components in the variant BOM
1
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
MRP Live can create production orders automatically
MRP Live can propose alternative solutions
MRP Live can priorities demand from sales orders
MRP Live can plan materials with recursive BOMs
Which statements are correct with reference to the Schedule Production app?
You can have more than one work center as a bottleneck work center.
This app is applicable only for pacemaker or bottleneck work center.
Only the Chart view is available for this app.
Planning Mode can be selected flexibly between Bucket and Sequence.
You can perform dispatch, deallocate, and reschedule of operations.
What is the function of Usage in the routing header details?
The usage key identifies the processing status of a task list.
The usage describes the task list types used in PRT or work centers.
You use this indicator to specify that the task list will be deleted with a deletion program.
The key specifies the areas in which the task list can be used.
Which of the following statements describe the Schedule Production app?
It is a straightforward tool for the capacity leveling of planned, production and process orders.
It is specially designed for dispatching orders to pacemaker or bottleneck work centers.
It records sales orders to ensure all demands are at the same level of fulfillment.
It maintains capacity and raw material constraints to achieve right product mix.
Which of the following are valid components of SAP Integrated Business Planning?
IBP for Inventory
IBP for Purchasing
IBP for Response and Supply
IBP for Statistical Forecasting
What determines whether the planned independent requirements in MRP are consumed by other requirements?
Requirements type
Requirements profile
Consumption sequence procedure
Order type
Which specific technique of planning material requirements (represented by the subsequent processing keys) became obsolete in MRP with SAP S/4HANA?
NETPL
NETCH
NEUPL
How can you carry out cost object controlling for production orders?
Milestone-related
Order-related
Cost-related
Product-related
Score 0 of 1
What are the possible categories for the Business Partner master data object in SAP S/4HANA?
Person
Customer
Organization
Group
Which time elements are relevant for lead time scheduling of a production order?
Total replenishment lead time
Float after production
Planned delivery time
Setup time
Which item statuses can you select inside a material BOM?
Engineering
Quality management
Service
Sales
With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud implementation?
Maintain Business Catalogs
Configure Your Solution
Manage Licenses
Manage Your Solution
Where can you maintain consumption mode and consumption periods for planning strategies?
In the MRP group
In the requirements class
In the plant parameters
In the material master
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand.
Which planning strategy do you use?
Make-to-stock production (10)
Which statements regarding material master numbering in SAP S/4HANA are correct?
The maximum length of a material is 18 characters for an external number range.
The material number is unique for a material.
It's required to activate and acknowledge the extended material length with Transaction FLETS.
The maximum length of a material is 18 characters for an internal number range.
A template can be assigned to material numbers but without any additional characters.
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?
Use a specific material status.
Use a specific material group
Use a specific MRP type.
Use a specific MRP controller.
You’re into an SAP S/4HANA greenfield implementation project and you're discussing the master data with the business team. Which of the following statements related to the production version are correct?
All of the above are true.
Production versions can be created based on the specified quantity range and validity period.
In comparison to SAP ERP, the production version is mandatory master data in SAP S/4HANA for in-house production and subcontracting.
BOM will be selected for MRP based on the production version.
Sourcing logic is consistent for PP-DS and MRP.
SAP supports digital transformation of organizations and making enterprises intelligent. What are the components of an intelligent enterprise?
Intelligent Suite
SAP Best Practices
Intelligent Technologies
SAP Business Technology Platform
SAP Activate Methodology
Which chart types does the tabular planning table provide in SAP S/4HANA?
Work center capacities chart
Orders (dispatched) chart
Capacity requirements chart
Order (pool) chart
What must be used in the system to plan the requirements for different subcontractors separately?
Production versions
Planning plant
MRP areas
Storage locations
What are the prerequisites for using batch derivation?
Batch determination selection conditions
Batch where-used list
Process instructions
Receiver-sender relationships
What facts document the strengths of SAP S/4HANA?
4x less process steps
1800x faster analytics and reporting
10x higher data footprint
7x higher data throughput
You are creating a production order manually. What activities are involved in this process?
Planning selection
Master data selection
Actual cost calculation
Order type determination
Capacity requirements determination
Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider?
You have to set one MRP area for every storage location.
Storage location MRP is replaced by MRP area functionality.
MRP Live does NOT support storage locations, but classic MRP still does.
Storage locations are NO longer supported.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use?
40 Planning with final assembly
30 Production by lot size
50 Planning without final assembly
20 Make to order production
Which methods are available for goods issue posting of material components for process orders?
Transfer order
Picking list
Backflushing
Kanban
What are typical characteristics of make-to-order production?
Unrestricted use stock
Sales order specific procurement
Planned independent requirements for a finished product trigger its production
Sales order specific stock
Which of the following MRP types belongs to consumption-based planning?
VB - Reorder point planning
MPS - Master production scheduling
PD - Material requirements planning
Which of the following is possible with PP/DS in SAP S/4HANA?
Disruption in the material flow
Recognition of inaccurate and outdated information
Constraint-based capacity planning
Higher flexibility in stock transfer
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use?
/SAPAPO/UPD_LOC_SP_PL
/SAPAPO/PPDS_DELTA_ORD_TRANS
/SAPAPO/CURTO_CREATE
/SAPAPO/CREATE_LOCATION
How can a material availability check be triggered automatically for a production order?
By order release
By capacity planning
By order confirmation
By mass processing
Which indicator in the material master determines if a material is relevant for advanced planning?
Individual/collective requirement
MRP type of material
Advanced Planning indicator
Availability check of the finished product
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
100% check
Simultaneous
First in first out (FIFO)
By usage probability
Which materials have a negative quantity in a bill of materials or in a recipe?
Bulk materials
Co-products
Continuous flow materials
Waste products
By-products
Which of the following is the main function of material requirement planning (MRP)?
MRP is used to ensure that production planning and distribution planning can be performed in a single step for small networks.
MRP is used to keep a check on target inventory violation cost.
MRP is used to ensure that fair share occurs across products, locations, customers, and time buckets in companies.
MRP is used to procure the requirement quantities on time both for internal purposes and for sales and distribution.
Which data model changes have been implemented in Sales and Distribution?
Elimination of document index tables
Elimination of status tables
Elimination of customer master tables
Elimination of output condition tables
Elimination of LIS tables for rebates
Which kinds of heuristics exist in SAP S/4HANA PP/DS?
Product Heuristics
Process Control Heuristics
Service Heuristics
Performance Heuristics
Which of the following statements describe the Monitor Work Center Schedules app?
There are 2 correct answers too this question.
It is a tool for dispatching, rescheduling, or deallocating several bottleneck operations on pacemaker work centers simultaneously in a graphical chart.
It is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.
It is a tool for dispatching, rescheduling, or deallocating operations not only on pacemaker works centers but on all work centers in a defined area of responsibility.
It is a tool to analyze the schedule of operations in a graphical chart.
Which of the following steps of order execution generates financial postings?
Material staging
Goods receipt
Order release
Material availability check
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
Individual phases
Individual process instructions
Individual control recipes
Individual operations
Which time elements can be reduced by a reduction strategy?
Goods receipt processing time
Queue time
Move time
Wait time
Which statements are correct with reference to the Monitor Work Center Schedules app?
Planning Mode is both Bucket and Sequence.
This app is available only in chart format.
This app is applicable only for pacemaker or bottleneck work centers.
Only pacemaker work centers are displayed as default, but you can select all the work centers with this app.
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
They can be used for repetitive manufacturing.
They can be used for manufacturing with collective orders.
They can be created automatically during month end process.
They can be applied to make-to-stock production order.
Based on which object does production with repetitive manufacturing take place?
Production order
Purchase requisition
Process order
Planned order
Which of the following statements are true regarding the material master?
The material type determines the screen sequence, material number assignment, and procurement type.
Maintaining the material master is a collective responsibility of different departments in an organization.
It’s possible to set the industry sector as default but not possible to set views and organization levels as default.
It’s always possible to change the industry sector of a material after you assign it.
You want to use capacity availability checks for production orders. Which settings have to be made for this?
The Relevant for Finite Scheduling indicator must be set.
The PRT Availability Check must be set in the checking control.
An overall profile must be assigned in the checking control.
A checking rule must be assigned in the checking control.
Which material-specific information can be transferred to a transportation lane in PP/DS?
Quota arrangements
Special procurement keys
Purchasing info records
Outline agreement
Which of the following are pillars of the SAP Activate framework?
Expert configuration
SAP Activate methodology
SAP Launch methodology
SAP industry cloud
Last changed10 months ago