When do you use variant bills of materials (BOMs)?
Please choose the correct answer.
Response:
When multiple material also have the same BOM
When a material has a configurable BOM
When a material has multiple BOMs
When multiple material is have similar BOMs
√ When multiple material also have the same BOM
Question:
At which level does detailed scheduling (DS) heuristics plan?
Vendor
Product
Resource
Order
√ Resource
Which of the following planning strategies are make-to-stock strategies?
There are 3 correct answers to this question.
Planning with final assembly
Planning without final assembly
Planning at assembly level
Production by lot size
√ Planning with final assembly
√ Planning at assembly level
√ Production by lot size
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
Material staging for next order in sequence
Posting of goods receipt for the product
Reduction of associated capacity requirements
Archiving of documents for assembly scrap
Posting of production costs to the production cost collector
√ Posting of goods receipt for the product
√ Reduction of associated capacity requirements
√ Posting of production costs to the production cost collector
Which of the following are master data objects for kanban?
There are 2 correct answers to this question.
Storage location
Control cycle
Product cost collector (PCC)
Production supply area (PSA)
√ Control cycle
√ Production supply area (PSA)
Which statements are correct for phantom assemblies?
Phantom assemblies are used to group components together.
Special procurement key 50 is used to define a material as a phantom assembly.
Phantom assemblies behavior can't be overwritten in the BOM.
Components in the phantom assemblies are aligned to the superior assembly.
Phantom assemblies are planning relevant.
√ Phantom assemblies are used to group components together.
√ Special procurement key 50 is used to define a material as a phantom assembly.
√ Components in the phantom assemblies are aligned to the superior assembly.
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
When you deliver a sales order
When you create a planned order
When you create a sales order
When the MRP results are saved
√ When you create a sales order
Which of the following are types of SAP Fiori apps available only on SAP HANA?
Transactional apps
Analytical apps
Environmental apps
Fact sheet apps
√ Analytical apps
√ Fact sheet apps
Where can you maintain consumption mode and consumption periods for planning strategies?
In the MRP group
In the plant parameters
In the material master
In the requirements class
√ In the MRP group
√ In the material master
For an in-house scenario, what are characteristics of MRP in classic ERP?
It uses infinite planning
It uses demand elements as input
It generates released production orders
It generates a feasible solution as output
√ It uses infinite planning
√ It uses demand elements as input
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
Handling Unit Management
Yard Management
Expected goods receipt
Labor Management
Slotting
√ Expected goods receipt
√ Labor Management
√ Slotting
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
Specify a positive planning horizon in the strategy profile.
Specify a negative offset time in the strategy profile.
Specify a positive offset time in the strategy profile.
Specify a negative planning horizon in the strategy profile.
√ Specify a negative offset time in the strategy profile.
What does the PP/DS optimization optimize?
It minimizes the number of possible solutions.
It minimizes an objective function.
It maximizes the ROI.
It minimizes the resource utilization.
√ It minimizes an objective function.
For what production type are production orders used?
Replenishment controlled by control cycles
Period and quantity-oriented production
Process manufacturing processes
Discrete manufacturing processes
√ Discrete manufacturing processes
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Exact lot sizing
Fixed lot sizing
Minimum lot sizing
Periodic lot sizing
√ Periodic lot sizing
In which material master views can you select the batch management checkbox?
Work Scheduling
Basic Data 1
Purchasing
MRP 4
√ Work Scheduling
√ Purchasing
What kind of demands form a demand program?
Customer requirements
Stock transfer requirements
Forecast requirements
Stock requirements
√ Customer requirements
√ Stock transfer requirements
√ Stock requirements
What does a line hierarchy in repetitive manufacturing represent?
A production line with prioritized alternative work centers
A production line with a parallel sequence in the routing
A production line with an alternative sequence in the routing
A production line with more than one work center
√ A production line with more than one work center
What is the sequence of the five steps of Demand-Driven Replenishment in SAP S/4HANA?
Analytics, replenishment planning, replenishment execution, buffer positioning, buffer sizing
Analytics, buffer positioning, replenishment planning, replenishment execution, buffer sizing
Analytics, buffer positioning, replenishment planning, buffer sizing, replenishment execution
Analytics, buffer positioning, buffer sizing, replenishment planning, replenishment execution
√ Analytics, buffer positioning, buffer sizing, replenishment planning, replenishment execution
Which settings do we find in a detailed scheduling strategy?
Whether a planned order or purchase requisition is created
Lot-sizing procedure
Planning direction, starting from the desired date
Planning in nonworking times
√ Planning direction, starting from the desired date
√ Planning in nonworking times
Which of the following are included as SAP S/4HANA Sales Simplifications?
SAP Sales Support replaces SAP CRM
SAP GTS replaces ERP SD Foreign Trade
Settlement Management replaces ERP SD Rebates
SAP Revenue Accounting replaces ERP SD Revenue Recognition
SAP order Fulfillment replaces ERP SD Availability Checking
√ SAP GTS replaces ERP SD Foreign Trade
√ Settlement Management replaces ERP SD Rebates
√ SAP Revenue Accounting replaces ERP SD Revenue Recognition
Which of the following are design principles of SAP Fiori?
Delightful
Complex
On-premise
Coherent
√ Delightful
√ Coherent
In which SAP S/4HANA version was the production planning and detailed scheduling (PP-DS) component introduced?
1909
1610
1511
1709
√ 1909
What are options for printing production order data?
Mass print of orders in the background
Original print of previously printed operations of an order
Print of a production order with system status CRTD
Reprint of a production order for a job ticket
√ Mass print of orders in the background
√ Original print of previously printed operations of an order
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent?
Available capacity version
Capacity category
Work center category
Number of individual capacities
√ Capacity category
Where does the system check master data selection settings during the creation of planned orders and production orders?
In the production version
In the bill of materials (BOM)
In the routing
In the MRP controller
In the production order type
√ In the production version
√ In the bill of materials (BOM)
√ In the routing
During planned order conversion to production order, an error occurred. What are the possible reasons?
The Work Scheduling view isn't maintained for the material.
The Advanced Planning view isn't maintained for the material.
The planned order is already converted to the production order.
The planned order is fixed in the DS board.
√ The Work Scheduling view isn't maintained for the material.
What are the possible categories for the Business Partner master data object in SAP S/4HANA?
Person
Group
Organization
Customer
√ Person
√ Group
√ Organization
Which tool is the central tool for interactive capacity planning in SAP S/4HANA Advanced Planning?
Detailed Scheduling Planning Board
Product Overview
Planning Table
Product View
√ Detailed Scheduling Planning Board
Which view contains plant-specific data that is used in procurement planning?
Basic data view
Scheduling view
Classification view
Materials planning view
√ Materials planning view
Capacity levelling: which of the following are functions provided by the graphical planning table?
You can use a planning log and a scheduling log to evaluate the results of your planning processes.
You can sort and dispatch operations in a defined sequence.
You can view all the relevant information about recurring standardized work sequences, inspections, and repairs.
You can find technical objects with enhanced filter and list functionality.
√ You can use a planning log and a scheduling log to evaluate the results of your planning processes.
√ You can sort and dispatch operations in a defined sequence.
In the SAP Fiori launchpad, how can the end user add or remove apps?
Use the theme designer menu in the SAP Fiori launchpad.
Select the home page of the SAP Fiori launchpad.
Right-click on the SAP Fiori launchpad and select the Add/Remove Apps option.
Select the Edit Home Page option in the user actions menu.
√ Select the Edit Home Page option in the user actions menu.
Which statements are correct with reference to the Schedule Production app?
You can have more than one work center as a bottleneck work center.
This app is applicable only for pacemaker or bottleneck work center.
Only the Chart view is available for this app.
Planning Mode can be selected flexibly between Bucket and Sequence.
You can perform dispatch, deallocate, and reschedule of operations.
√ This app is applicable only for pacemaker or bottleneck work center.
√ Planning Mode can be selected flexibly between Bucket and Sequence.
√ You can perform dispatch, deallocate, and reschedule of operations.
Which information is required when you set up an order type?
Over delivery tolerance limit
Production supervisor
Settlement profile
Automatic actions an order release
√ Settlement profile
What is the first step in the MRP run?
Lot size calculation
Source determination
Net requirements calculation
BOM explosion
√ Net requirements calculation
Which time elements are relevant for lead time scheduling of a production order?
Total replenishment lead time
Planned delivery time
Float after production
Setup time
√ Total replenishment lead time
√ Setup time
What are key benefits of SAP S/4HANA MRP Live?
Significantly higher data footprint leveraging SAP HANA
Runs on any device
Real-time analysis of disruptions in the material flow
Simultaneous capacity planning by default
√ Runs on any device
√ Real-time analysis of disruptions in the material flow
With this app, you can generate buffer (stock) level proposals for your DDR-relevant products based on their average daily usage, decoupled lead time, buffer profiles, and several other factors.
Replenishment Planning by Planning Priority app
Replenishment Execution app
Schedule Product Classification app
Schedule Buffer Proposal Calculation app
√ Schedule Buffer Proposal Calculation app
Which item statuses can you select inside a material BOM?
Service
Engineering
Quality management
Sales
√ Engineering
√ Sales
Which time elements can be reduced by a reduction strategy?
Wait time
Move time
Queue time
Goods receipt processing time
√ Wait time
√ Move time
√ Queue time
What are major reasons for the SAP S/4HANA Enterprise Management system?
It offers analytics with real-time data.
It includes CRM, SRM, and APO.
It is based on stable core ERP processes.
It provides a scalable infrastructure.
√ It offers analytics with real-time data.
√ It is based on stable core ERP processes.
√ It provides a scalable infrastructure.
When you execute an MRP Live run from various MRP monitoring apps, which of the following statements are correct?
Only MRP materials are considered; MPS materials are out of scope with monitoring apps.
Net change planning is executed.
MRP will always plan materials with single-item/single-level planning.
Regenerative planning is always used to make sure that the material is always planned.
√ Net change planning is executed.
√ MRP will always plan materials with single-item/single-level planning.
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
Plant
Material
Production version
Work center
√ Material
√ Work center
Which alternative unit of measure is used for ordering the material and is the default unit for purchasing functions?
Production unit
Order unit
Unit of issue
Sales unit
√ Order unit
What are some of the advantages of using Kanban?
It is mostly accomplished by manual postings
Replenishments are based on centralized planning
Replenishments are created close to the actual need
It is a simplified form of production control
√ Replenishments are created close to the actual need
√ It is a simplified form of production control
Which technological advances enabled the development of SAP S/4HANA as the digital core?
Advances in the three-tier architecture approach
Multi core processors enabling parallelism of tasks
Big and affordable memory
Wide adoption of web standards such as Service oriented architecture
Capability to add to server landscape and scale
√ Multi core processors enabling parallelism of tasks
√ Wide adoption of web standards such as Service oriented architecture
√ Capability to add to server landscape and scale
When do you maintain the work center that represents the production line for repetitive manufacturing?
Repetitive manufacturing profile
Routing
Production cost collector
√ Production version
√ Routing
Which time elements are part of a routing operation?
Float before production
Pick/pack time
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning?
Alternative resources are fully occupied.
The Change Planning Direct on indicator is set.
The work center has several individual capacities.
The planning strategy is infinite.
√ The work center has several individual capacities.
√ The planning strategy is infinite.
Before a user can add multiple production versions in a material master, what information should be collected?
Lot sizes
Validity dates
Work center hierarchy
BOM status
Task list group number
√ Lot sizes
√ Validity dates
√ BOM status
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?
Storage location data
Production version data
MRP area data
Warehouse number data
√ Storage location data
√ Warehouse number data
Which of the following functions can be performed with a REM planning table?
Production orders can be created.
Planned orders can be created.
Component backflush can be performed.
Planned order quantities can be dispatched.
Final confirmations can be performed.
√ Production orders can be created.
√ Planned orders can be created.
√ Planned order quantities can be dispatched.
What is the function of Usage in the routing header details?
The usage describes the task list types used in PRT or work centers.
The usage key identifies the processing status of a task list.
You use this indicator to specify that the task list will be deleted with a deletion program.
The key specifies the areas in which the task list can be used.
√ The key specifies the areas in which the task list can be used.
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
Use the material staging report.
Use batch determination.
Use the batch information cockpit.
Use the material where-used report.
√ Use the batch information cockpit.
Which of the following statements describe the Monitor Work Center Schedules app?
There are 2 correct answers too this question.
It is a tool for dispatching, rescheduling, or deallocating several bottleneck operations on pacemaker work centers simultaneously in a graphical chart.
It is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.
It is a tool to analyze the schedule of operations in a graphical chart.
It is a tool for dispatching, rescheduling, or deallocating operations not only on pacemaker works centers but on all work centers in a defined area of responsibility.
√ It is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.
√ It is a tool to analyze the schedule of operations in a graphical chart.
What are possible configuration steps when setting up the alert monitor in Advanced Planning?
Assign the overall profile to the authorization profile.
Create object selection variant for transportation lane-related alerts.
Create object selection variant for resource-related alerts
Create object selection variant for product-related alerts.
Assign the alert profile to the overall profile.
√ Create object selection variant for resource-related alerts
√ Create object selection variant for product-related alerts.
√ Assign the alert profile to the overall profile.
What data processing steps are obsolete if you use SAP S/4HANA Analytics?
Online analytical processing (OLAP)
Extract on, transformation, and loading (ETL)
Online transaction processing (OLTP)
Pre computed aggregation views
√ Extract on, transformation, and loading (ETL)
√ Pre computed aggregation views
To execute the subcontracting process in PP-DS, what must be set up in SAP S/4HANA?
Routings
Subcontracting MRP areas
Product versions
Storage locations as MRP areas
√ Subcontracting MRP areas
√ Product versions
Which of the following is a valid sequence of the main activities in product on order processing?
Creation, staging, release, material withdrawal, confirmation
Creation, scheduling, release, variance calculation, confirmation
Creation, release, scheduling, material withdrawal, confirmation
Creation, scheduling, release, material withdrawal, confirmation
√ Creation, scheduling, release, material withdrawal, confirmation
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
By eliminating fields for different stock types
By eliminating inventory tables
By eliminating material master tables
By eliminating inventory history tables
By eliminating hybrid tables
√ By eliminating fields for different stock types
√ By eliminating inventory tables
√ By eliminating inventory history tables
What is the difference between the earliest dates and latest dates of an operation?\
Processing time
Teardown time
The BOM is exploded during backflushing based on which of the following?
The system will always explode the BOM based on the creation date of the BOM.
If a planned order is maintained, then the component list of the planned order is exploded.
If a revision level and a planned order are maintained, then the revision level has the higher priority.
The system explodes the current BOM (from the production version) based on the posting date.
√ If a planned order is maintained, then the component list of the planned order is exploded.
√ The system explodes the current BOM (from the production version) based on the posting date.
You are creating a production order manually. What activities are involved in this process?
Order type determination
Actual cost calculation
Capacity requirements determination
Master data selection
Planning selection
√ Order type determination
√ Capacity requirements determination
√ Master data selection
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
When alternate resources are used within one operation
When multiple operations are maintained for one product
When multiple planned orders exist on one resource
When multiple production versions are maintained for one product
√ When alternate resources are used within one operation
Which of the following deployment option provides the latest innovations delivered quarterly?
SAP S/4HANA, hybrid edition
SAP S/4HANA Cloud, extended edition
SAP S/4HANA AnyPremise edition
SAP S/4HANA Cloud, essentials edition
√ SAP S/4HANA Cloud, essentials edition
Which of the following consists of interoperation times of an operation?
What is the difference between co-products and by-products?
Only by-products have a zero inventory valuation.
Only co-products can be manufactured in isolation from the main product.
Only co-products are identified by a special item category in the bill of material (BOM).
Only co-products appear in the process or production order settlement rule.
√ Only co-products appear in the process or production order settlement rule.
Which statement is correct? If you want to perform capacity planning for planned orders, then execute the MRP Live run with:
Lead-time scheduling
Basic date scheduling
Midpoint scheduling
Finite scheduling
√ Lead-time scheduling
What are examples of assignment objects you can maintain in the Engineering Workbench?
Material to bill of materials (BOM) assignment
Material to production version assignment
Component assignment
Routing to sequence assignment
Material to routing assignment
√ Material to bill of materials (BOM) assignment
√ Component assignment
√ Material to routing assignment
Which business processes are affected by settings in the order type-dependent parameters?
Define integration to cost accounting.
Initiate quality inspections.
Implement engineering changes.
Select master data.
√ Define integration to cost accounting.
√ Initiate quality inspections.
√ Select master data.
In a first step you have created master recipes. In which sequence are the additional objects created?
Process order
Control recipe
PI sheet
Process message
√ Process order
How many files can you connect to a document info record?
50
100
2
N
√ N
Which statements are correct regarding BOMs?
You can create a BOM that is applicable to all the plants by maintaining special character “*”
It's not possible to allocate group BOMs to individual plants.
When you create the BOM for the first time, it will have a blank technical type.
BOM usage controls which material types for BOM headers are allowed.
Pipeline materials can't be assigned as a stock item in the BOM.
√ When you create the BOM for the first time, it will have a blank technical type.
√ BOM usage controls which material types for BOM headers are allowed.
√ Pipeline materials can't be assigned as a stock item in the BOM.
The end user is working on a production order but can't post GI for the order, encountering error message Current order status does not allow goods withdrawals. The user then tried to confirm the order and again encountered an error. The Order is not released.
What is the next course of action the user should take?
First, release the order.
Delete the order because there are so many errors in it.
Try to post GR, and the error may be resolved.
First, print the shop floor papers.
√ First, release the order.
What must be used in the system to plan the requirements for different subcontractors separately?
Planning plant
Storage locations
MRP areas
Production versions
√ MRP areas
What are the key aspects of SAP S/4HANA?
SAP S/4HANA is built on SAP HANA
SAP S/4HANA increases the data footprint.
SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.
SAP S/4HANA has minor changes on data model.
√ SAP S/4HANA is built on SAP HANA
√ SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.
Which functional capabilities does the Detailed Scheduling Board have?
Change sales order quantities
Undo for drag & Drop planning activities
Enter time-ticket confirmation for production orders
Change planned order quantities
√ Undo for drag & Drop planning activities
√ Change planned order quantities
What does the Material Requirements Planning run trigger?
The creation of planned requirements
The creation of planned independent requirements
The creation of planned orders
The creation of production orders
√ The creation of planned requirements
√ The creation of planned orders
What are the main processes of the embedded PP/OS in SAP S/4HANA?
Source determination for external procurement
Optimization of the production plan
Long-term production planning
Calculation of inventory buffer size
√ Source determination for external procurement
√ Optimization of the production plan
With reference to the material availability check, which of the following statements are correct?
The material availability check is always performed automatically.
When there is a material shortage, the system sets the status MSPT (material shortage).
The scope of check is determined for each component.
You can check missing parts information by accessing Transaction COOIS.
√ When there is a material shortage, the system sets the status MSPT (material shortage).
√ The scope of check is determined for each component.
Last changed9 months ago